Loading...
1801 KATELLA AVE (5)Permit Types BLD ELE MEC PLM X X Permit Number: BLD2023-00895 Issued: 02/24/2023 www.anaheim.neUbuilding (714)7654626 Quarter Section: 107 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765.5153 Site Address:.1801 E KATELLA AVE 1037, Anaheim, CA 92805 Legal Description: N TR 16618 BLK LOT 1 UN 1037 TRACT 16618, LOT 1 OF APNc93028553 Project Description: Electrical to upgrade electrical in kitchen L'(4% / 4\y Living Area: Number of Stories: 1 Valuation: 0.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinldered: No Cool Roof: Total Fees paid for Permit: 613.50 People Associated with Project: Contractor ROY BARGIL 1470 MARIA LANE SUITE 200 WALNUT, CA 92780 Permit Applicant ROY ORBARGIL 7290 EDINGER AVE APT 3011 HUNTINGTON BEACH, CA 92647 Owner REYES KEVIN AUSTIN 2327 OCANA AVE Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Receptacle, switches, lights 21 The permit shall expire by limitation and become null and void K the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�pHEIM �q< Cityof Anaheim O� �o Building Division F y u a ' DGNDED `gy Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test c rical Final Plum mal Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Mi oat on Measures Do not install subfloor or pour floor slab until the follwing applicable items have been signed: Building Final 4765-5163) Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sionede 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical rough Electrical oc Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Constructea Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service