Loading...
118 S LINHAVEN CIRPermit Types BLD ELE MEC PLM X Permit Number: BLD2023-01082 Issued: 03/07/2023 www.anaheim.net/building (714)765-0626 Quarter Section: 40 CITY OF ANAHEIMont;tee BUILDING DIVISION ' ! '2hVS. A*AHEIM BLVD. (714) 765.5153 Site Address: 118 S LINHAVEN CIR, ANAHEIM, CA 92804 Legal Description: N TR 14697 BLK LOT 36 APN': 4801139 Project Description: Residential EV Charger Level 2 kv 31'7 /y3 .Ivry Living Area: Number of Stories: Valuation: 0.00 Garage Area: Construction Types: Carpet Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinldered: Cool Roof: Total Fees paid for hermit: 0.00 People Associated with Project: Contractor MASAH ELECTRIC 790 N EUCLID ST APT 203202108231140532135 ANAHEIM, CA 92801 Permit Applicant Keyed A Madwan Type Electrical Fixtures Qty Type Plumbing Fixtures Qly Mechanical Fixtures Qty EV Charger 1 The permit shall expire by [Imitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. City of Anaheim Building Division Do not occupy this building until the final inspections have been made. INSPECTION I DATE INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been siQned: Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been si ned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Framing (Only after Plbg., Ele., Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mac & Plbg) Interior Lath Exterior Lath Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Constructep Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service FINAL INSPECTIONS I DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 Fire Dept. Final (714) 765-5041 Water Engineering (714) 765-4591 Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) COA/Mioation Measures IBuilding Final (714 765-5153) Last Inspection -Final Only After Above Completed PARTIAL INSPECTIONS Building Inspections Mechanical Inspections Plumbing Inspections Electrical Inspections