Permit Number: BLD2018-04839
Issued: 12/19/2018
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 83
Site Address: 130 W LINCOLN AVE
Legal `Description:
C
200 S.`XHEI *L
(7141 765 - 5153
r
EIM
Project Description: Tenant Improvement: 4,000 sq ft to remove wall. for new meatiseafood counter, reconfigure restrooms for
accessibilty compliance, remodel counters at bakery and floral counters and install new refrigeration cases.
Number of Stories 1 Valuation:
$450,000.00
Construcion Types:
IIIB, ,
Occupancy Groups:
M, , , ,
Fire Sprinklered?
Yes
Total Fees paid for Permit:
4.098.30
People Associated with Project:
Contractor STEVE JULIUS CONSTRUCTION INC 230 CALLE PINTORESCO SAN CLEMENTE CA 92673 0000
Permit Applicant MICHAEL HEITZMAN
Type Electrical,'Fixtures,'
1 r r W Y R
Receptacle, switches, lights _ -
Motors - Factory Wired Ayppliance, up'to 1 i b-=
h.p. `
Ct -� ��
`
.! ...) ._! .I
Closet
Plumbing Fixtures Qty Type Mechanical Fixtures Qty
Alteration/Vent Piping
Sewer per 100 ft.
2
1
1
3
15
1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit combo
P�PHEIM �q<
City of Anaheim
Building Division F y
u >
�Ot,N0 01
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 7655126
INSPECTION DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 7655041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 7655194 (Allow 10 business days)
SetbacklForms/rrenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
s e •
Building Final (714 7655153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
/S%19��t'�.,.
6NFNI 11
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
A
I a T n n A A D I r.1;:1)
Do not cover or conceal the work below until the following applicable items have
beenDATE
12� tC, [2-biN/�
�-
1st Floor Shear �
'
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (SheathinglDiaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy) - ET
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
,
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Strutt., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service