Loading...
452 S LAUREL TREE DRW-, Permit Types BLD ELE MEC PLM X Permit Number: BLD2022-06153 Issued: 12/29/2022 www.anaheim.net/building (714)765-4626 Quarter Section: 219 CITY OF ANAHEIM Site Address: 452 S LAURELTREE DR, ANAHEIM, CA 92808 LegaW6e notion: N TR 12988 BLK LOT 85 APN:35422222 Project Description: Residential EV Charger Level 2 BUILDING DIVISION 200 S. ANAHEIM BLVD. 17141 765 -5153 Living Area: Number of Stories: 0 Valuation: 0.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof. Total Fees paid for Permit: 167.00 People Associated with Project: Owner DO ROBERT 452 S LAURELTREE DR Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�p14EIAl C9< Cityof Anaheim O� io Building Division z u > �0��►OED Do not occupy this buildinq until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been signed7 Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service