Loading...
617 S LA VERNE ST (2)Permit Types BLD ELE MEC PLM X I X X X Permit Number: BLD2017-03482 Issued: 07/18/2019 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 61 Site Address: 617 S LA VERNE ST Legal Description: KOEFFLER TR LOT LOT IN TR C 200 SiANAHEIMIBLVD. (714) 765 - 5153 EIM W Project Description: New Residential Construction: Construct 2,400 sq. ft. new single family primary dwelling (2) story with 4 bedrooms and 31/2 bathrooms. Construct 400 sq. ft. (2) car garage and 61 sq. ft. balcony. BLD2018-03918 Bath Tub 2 Living Area: 2,400 Dwelling Units: 1 Valuation: $250,000.00 Garage Area 400 Construcion Types: N/A, , Balcony / Deck Area: 61 Occupancy Groups: R3, U. , , Motors - up to 1 h.p. Fire Sprinklered? Yes Sub Panel/Temp Pwr - < 600 V, 0 < amps Cool Roof o <= 200 Total Fees paid for Permit: 15.175.67 People Associated with Project: Water Heater 1 Owner JOSE LUIS VILLAFUERTE 619 W LA VERNE ST ANAHEIM CA 92805-1851 Water Distribution 1 Engineer PABLO SANCHEZ 1840 S GAFFEY ST 382 LOS ANGELES CA 90731 Gas System (1-5 outlets) 1 Engineer CONWAY COOKE 34658 LINDA ROSEA RD TEMECULA CA 92592 Lawn Sprinklers (valves) 1 Permit Applicant JOSE L VILLAFUERTE 619 W. LA VERNE ST ANAHEIM CA 92805 Water Main per 100 ft. 2 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Meter/Disc Sw - under 600 V, up to 200 1 Bath Tub 2 amps Shower 2 New or total rewire -1 or 2 family 2,400 Lavatory 6 New or total rewire - garage/carport 400 Kitchen Sink 1 Motors - up to 1 h.p. 1 Repair/Drainage Alteration/Vent Piping 1 Sub Panel/Temp Pwr - < 600 V, 0 < amps 1 Dishwasher 1 <= 200 Washing Machine Rough 1 Water Heater 1 Water Distribution 1 Gas System (1-5 outlets) 1 Lawn Sprinklers (valves) 1 Water Main per 100 ft. 2 Sewer per 100 ft. 1 Type Mechanical Fixtures Qty Heating Appliances, including vent 1 Heating/Cooling Coil 1 Compressor/Boiler - up to 15 hp 1 Residential Registers 11 Ventilation Fan - <= 300 cfm on single duct 6 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_combo City of Anaheim Building Division Do not occupy this buildinq until the final inspections have been made. INSPECTION I DATE INSPECTOR Do not pour concrete until the following applicable items have been si ned: ;v Plumbing (Ground/Underfloor Drain Waste) s 7rZ,Q Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been si ed• Plumbing (Ground/Underfloor Water) Underfloor Rough Gas - Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) 3Pc U .za Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned: 1st Floor Shear 7Sc- _ 2 0 Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear 7f e, Roof (Sheathing/Diaphragm/Frame) -)1& / 2 Z 2-26 I —tq- 2 [ Rough Duct (Mechanical) FINAL INSPECTIONS Rough Mechanical All applicable items below must be signed before utilities are released Final Gas Test Rough Electrical 7f L Electrical Final Rough COA/Mitagation Measures 3, -?/-.22- 3/a2Mechanical MechanicalFinal Framing (Only after Plbg., Ele., Mec. & Fire) Cross Connection Control (714) 765-4280 Insulation (Sound/Energy) J676 Do not tape or plaster until the following applicable items have been signed: Drywall Water Engineering (714) 765-4591 Drywall Penetrations (Ele, Mec & Plbg) Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) COA/Migation Measures Interior Lath Exterior Lath MV •Z6 Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct.. Ele., or Mec.) Backflow Service PARTIAL INSPECTIONS Buildinq Inspections Mechanical Inspections Plumbing Inspections Electrical Inspections FINAL INSPECTIONS DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final 3, -?/-.22- 3/a2Mechanical MechanicalFinal Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 Fire Dept. Final (714) 765-5041 Water Engineering (714) 765-4591 Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) COA/Migation Measures Building Final (714 765-5153) Last Inspection -Final Only After Above Completed JI 2- 61—C PARTIAL INSPECTIONS Buildinq Inspections Mechanical Inspections Plumbing Inspections Electrical Inspections