Permit Number: BLD2017-03482
Issued: 07/18/2019
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 61
Site Address: 617 S LA VERNE ST
Legal Description: KOEFFLER TR LOT LOT IN TR
C
200 SiANAHEIMIBLVD.
(714) 765 - 5153
EIM
W
Project Description: New Residential Construction: Construct 2,400 sq. ft. new single family primary dwelling (2) story with 4
bedrooms and 31/2 bathrooms. Construct 400 sq. ft. (2) car garage and 61 sq. ft. balcony. BLD2018-03918
Bath Tub 2
Living Area: 2,400 Dwelling Units:
1 Valuation:
$250,000.00
Garage Area 400
Construcion Types:
N/A, ,
Balcony / Deck Area: 61
Occupancy Groups:
R3, U. , ,
Motors - up to 1 h.p.
Fire Sprinklered?
Yes
Sub Panel/Temp Pwr - < 600 V, 0 < amps
Cool Roof
o
<= 200
Total Fees paid for Permit:
15.175.67
People Associated with Project:
Water Heater 1
Owner JOSE LUIS VILLAFUERTE
619 W LA VERNE ST ANAHEIM CA 92805-1851
Water Distribution 1
Engineer PABLO SANCHEZ
1840 S GAFFEY ST 382 LOS ANGELES CA 90731
Gas System (1-5 outlets) 1
Engineer CONWAY COOKE
34658 LINDA ROSEA RD TEMECULA CA 92592
Lawn Sprinklers (valves) 1
Permit Applicant JOSE L VILLAFUERTE
619 W. LA VERNE ST ANAHEIM CA 92805
Water Main per 100 ft. 2
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty
Meter/Disc Sw - under 600 V, up to 200
1
Bath Tub 2
amps
Shower 2
New or total rewire -1 or 2 family
2,400
Lavatory 6
New or total rewire - garage/carport
400
Kitchen Sink 1
Motors - up to 1 h.p.
1
Repair/Drainage Alteration/Vent Piping 1
Sub Panel/Temp Pwr - < 600 V, 0 < amps
1
Dishwasher 1
<= 200
Washing Machine Rough 1
Water Heater 1
Water Distribution 1
Gas System (1-5 outlets) 1
Lawn Sprinklers (valves) 1
Water Main per 100 ft. 2
Sewer per 100 ft. 1
Type Mechanical Fixtures Qty
Heating Appliances, including vent 1
Heating/Cooling Coil 1
Compressor/Boiler - up to 15 hp 1
Residential Registers 11
Ventilation Fan - <= 300 cfm on single duct 6
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit_combo
City of Anaheim
Building Division
Do not occupy this buildinq until the final inspections have been made.
INSPECTION I DATE INSPECTOR
Do not pour concrete until the following applicable items have been si ned:
;v Plumbing (Ground/Underfloor Drain Waste) s 7rZ,Q
Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have been
si ed•
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas -
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.) 3Pc U .za
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned:
1st Floor Shear 7Sc- _ 2 0
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear 7f e,
Roof (Sheathing/Diaphragm/Frame) -)1& / 2 Z 2-26
I —tq- 2 [
Rough Duct (Mechanical)
FINAL INSPECTIONS
Rough Mechanical
All applicable items below must be signed before utilities are released
Final Gas Test
Rough Electrical 7f L
Electrical Final
Rough COA/Mitagation Measures
3, -?/-.22-
3/a2Mechanical
MechanicalFinal
Framing (Only after Plbg., Ele., Mec. & Fire)
Cross Connection Control (714) 765-4280
Insulation (Sound/Energy)
J676
Do not tape or plaster until the following applicable items have been signed:
Drywall
Water Engineering (714) 765-4591
Drywall Penetrations (Ele, Mec & Plbg)
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
COA/Migation Measures
Interior Lath
Exterior Lath
MV
•Z6
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct.. Ele., or Mec.)
Backflow
Service
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical Inspections
Plumbing Inspections
Electrical Inspections
FINAL INSPECTIONS
DATE I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
3, -?/-.22-
3/a2Mechanical
MechanicalFinal
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-5041
Fire Dept. Final (714) 765-5041
Water Engineering (714) 765-4591
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
COA/Migation Measures
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
JI 2-
61—C
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical Inspections
Plumbing Inspections
Electrical Inspections