619 W LA VERNE ST (3)r—
Permit Types
BLD ELE MEC PLM
X I X
Permit Number: BLD2018-03918
Issued: 07/18/2019
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 61
Site Address: 619 W LA VERNE ST.
Legal Description: KOEFFLER TR LOT- LOT IN TR
CI
200 SN-ANAHEIM4L
(714) 765 - 5153
EIM
7�
Project Description: Residential Remodel: 505 sq ft attached patio, 145 sq ft freestanding patio and 180 sq ft detached storage
shed all to be legalized. 202 sq ft to demo existing bedroom and convert into open covered patio. (Existing single -story home to
be converted into second unit). REF: BLD2017-03482
Valuation: $10,000.00
Construcion Types: VB, ,
Occupancy Groups: U, , ,
Total Fees paid for Permit: 5,189.87
People Associated with Project:
Owner
JOSE LUIS VILLAFUERTE
619 W LA VERNE ST ANAHEIM CA 92805-1851
Permit Applicant
JOSE L VILLAFUERTE
619 W. LA VERNE ST ANAHEIM CA 92805
Engineer
PABLO SANCHEZ
1840 S GAFFEY ST 382 LOS ANGELES CA 90731
Engineer
CONWAY COOKE
34658 LINDA ROSEA RD TEMECULA CA 92592
Type Electrical Fixtures
Receptacle, switches, lights
Qty Type Plumbing Fixtures Qty Type
5
Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit_combo
�PNElm Cq
Cityof Anaheim O� P <�o
Building Division N z
D
DED
Do not occupy this building until the final Inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings) ;2 -Z
CONMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
-
Building Final (714 765-5153)
last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
!9!„1n - 9-2 ?a&
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (JoistIGirders)
Avy E42'+- �40k
UndernoorInsulation (Raised Foundation Only)
CjZ-ZZFVA#oa49 2AT'v7 rte/ 610- IWA-ME
Floor Nailing (Raised Foundation Only)
— Ile.,,
V ,TU
2nd Floor (Floor Nailing)
_fir ,y RM&t Yxf4;s�,•�.s ft 4fa2A� l�
Do not cover or conceal the viark below until the following applicable items have
been s*nne&
EAcN-• we
1st Floor Shear
� '
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame).
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical 124-Z
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Strutt., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless swoned ofn
Sewer
Water Engineering Backflow (Testable Only)
Water Service
N�