Permit Number: BLD2023-02861
ISSL?d:-n&10/2023
www.anaheim.net/building
(714)765.4626
Quarter Section: 10
Site Address: 667 S LASSEN CT, ANAHEIM, CA 92804
Legal Description: N TR 15703 BLK LOT 17
APN: 07996139
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 7t3S - 5158
Project Description: Residential Photovoltaic System with Microinverters
Living Area: Number of Stories: Valuation: 16,500.00
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Sprinidered:
Cool Root Total Fees paid for Permit; 260.15
People Associated with Project:
Contractor SOLAR OPTIMUM DESIGN & ELECTRICA 501 W GLENOAKS GLENDALE, CA 91202
Permit Applicant SOLAR OPTIMUM
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Microinveter 22
Sub Panel)Temp Pwr - Under 600 V, up to 1
200 amps
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
P�pHEIM CqC
City of Anaheim 04 A
Building Division F z
u >
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final�6Zy
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned:Building
Final (714 765-5153)
Last Inspection-Final Only After Above Completed
4/31/4
Q
/ /
CI
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been s' e
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service