1431 E LA PALMA AVE (6)Permit Types
BLD ELE MECPLM
X
Permit Number: BLD2016-06114
Issued: 03/01/2017
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 91
Site Address: 1431 E LA PALMA AVE
Legal Description:.GOLDEN STATE TR # 2 LOT 24 S 1 AC W
200
(714) 765 - 5153
EIM
Project Description: Demolition: (8) non -load bearing walls on the first floor and (7) non -load bearing walls on the second floor
for future interior remodel/conversion to bed/breakfast (demolition only).
Valuation:
$10,000.00
Construcion Types:
WA, ,
Fire Sprinklered?
No
Cool Roof
NO
Total Fees paid for Permit:
949.00
People Associated with Project:
Owner KIRK WHEELER 1431 E LA PALMA AVE ANAHEIM CA 92805-1554
Contractor BETTER LIVING CONSTRUCTION
Permit Applicant STEVEN LAWYER
31878 DEL OBISPO SAN JUAN CAPISTRANO CA 92675 0000
31878 DEL OBISPO SAN JUAN CAPISTRANO CA 92675
Type ElectricalFixture"3. - ' (tjr Type Plumbing Fixtures Qty
Type Mechanical Fixtures Qty
t M Jq.Ni00 .: 1.11
The permit shall expire by limitation, and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance-' A net pgrrnit is fequired to commence or continue work. fbld—Permit_combo
P�Pp1EIA4 �q<
Cityof Anaheim o� �o
Building Division i i
U >
SOUNDED �$y^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714).765-5126
INSPECTION DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour Floor slab until the follwing applicable items have been
s' e •
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
r
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girdem)
( - 1 ., 11 1
Underfloor Insulation (Raised Foundation Only)
p T
n (fad
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
I
Do not cover or conceal the work below until the following applicable items have
been e
1st Floor Shear
' t�
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not hackfill unlaq- gunned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service