1529 W LORANE WAY (5)Permit Types
BLD ELE MEC PLM
X X X X
Permit Number. BLD2022-04605
Issued: 10/04/2022
www.anaheim.net/building
(714)765-4626
Quarter Section: 59
Site A. ddeess:1629 W LORANE WAY, ANAHEIM, CA 92802
Legal Description: N TR 2309 LOT 105
APN: 09051406
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 . $153
Project Description: Residential Addition: 414 sq ft addition for new kitchen, dining room and bathroom. 154 sq ft remodel to convert
existing kitchen into new bedroom #4. (4BD/3BA) REF: BLD2022-04606
Living Area:
Number of Stories:
1 Valuation: 0.00
Garage Area:
Construction Types: VS
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklered: No
Cool Roof:
-
Total Fees paid for Permit: 105.00
People Associated with Project:
Permit Applicant Khlem Pham
Owner TERRENCE GARRITY
1529 W LORANE WY ANAHEIM, CA 92802
Type Electrical Fixtures
Qty
Type Plumbing Fixtures
Qty Mechanical Fixtures Qty
New or total rewire -1 or 2 family
414
Dishwasher
1 Residential Registers 2
Receptacle, switches, lights
7
Garbage Disposal
1 Ventilation Fan - - 300 cfm on single duct 2
Sub PaneVTemp Pwr - < 600 V, 0 <
1
Gas System (1.5 outlets)
1
amps — 200
Kitchen Sink
1
Lavatory
1
Repair/Drainage AlterationrVent Piping
i
Shower
1
Water Closet
1
Water Distribution
1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
P�pNEIM �q<
City of Anaheim o� io
Building Division F i
u >
�ot,NpEo �ay�
Do not occupy this buildinq until the final inspections have been made.
FINAL INSPECTIONS DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 766-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab'until the follwing applicable items have been
• swanedi
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sffianed7
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire) +
Insulation (Sound/Energy)
Do not tape or plaster-until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New '
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service