Loading...
1529 W LORANE WAY (8)Permit Types BLD ELE MEC PLM X X X X Permit Number: BLD2022-04606 Issued: 10/04/2022 www.anaheim.netlbuilding (714)765-0626 Quarter Section: 59 CITY OF ANAHEIM Site Address:1529 W LORANE WAY B, ANAHEIM, CA 92802 Legal Description: N:TR;2309 LOT 105 P x"di ,R :.. APN:09091406 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765-5153 Project Description: (ADLI) - New Residential Construction: 789 sq ft for new detached (2) bedroom accessory dwelling unit with 28 sq ft poroh.(20/2BA). REF:BLD2022-04605 Living Area: Number of Stories: 1 Valualon: 75,000.00 Garage Area: Construction Types: VB Carport Area: Occupancy Groups: R3 Balcony / Deck Area: Fire Sprinklered: No Cool Roof. Total Fees paid for Permit: 105.00 People Associated with Project: Owner TERRENCE GARRITY 1529 W LORANE WY ANAHEIM, CA 92802 Type Electrical Fixtures Qty Type Plumbing, Fixtures Qty Mechanical Fixtures _ Qty Meter/Disc Sw - under 600 V, up to 200 2 Dishwasher 1 Compressor/Boller - up to 15 hp 1 amps Garbage Disposal 1 Heating Appliances, including vent 1 New or total rewire -1 or 2 family 789 Heating/Cooling Coil 1 Gas System (1.5 outlets) 1 Residential Registers 5 Kitchen Sink 1 Ventilation Fan - — 300 cfm on single duct 4 Lavatory 2 Repair/Drainage AlterationiVent Piping 1 Sewer per 100 ft. 1 Shower 2 Water Closet 2 Water Distribution 1 Water Heater 1 Water Main per 100 ft. 1 vpdaW ID 11 �2v The permit shall expire by Iimitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. City of Anaheim FP�PNEIM Cq�� oo I FINAL INSPECTIONS I DATE I INSPECTOR I I All applicable items below must be signed before utilities are released ( mutt ing wivimon F z u > DED %a�^ Do not occupy this building until the final inspections have been made. Final Gas Test Electrical Final !` Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Pibg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable'Only) Water Service