2089 W LAFAYETTE DR (2)Permit Types
BLD ELE MEC PLM
X
Permit Number: OLD2022-05632
Issued: 11/28/2022
www.anaheim.neUbuilding
(714)765-4626
Quarter Section: 39
CITY OF ANAHEIM
BUILDING DMSION
200 S. ANAHEIM BLVD.
(7141 765 -5153
Site Address: 2089WFAYETTE DR, ANAHEIM, CA 92801
Liegal Description: N TR 12102 BLK LOT 4 UN 129 TR 12102 LOT 4 UNIT 12
:.-..r :.....
APN:'9_mss3777.190
Project Description: Plumbing for water heater change out Inside the garage
Ling kea: Number of Stories: 1 Valuation: 0.00
Garage Area: Construction Types: WA
Carport Area: Occupancy Groups:
Balcony / Dock Area: Fire Sprinklered:
Cool Roof: Total Fees paid for Permit: 167.00
People Associated with Project:
Permit Applicant logan appel
Owner MARTINEZ ANNABELLE 2089 W LAFAYETTE DR 129
.Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures - Qty
Water Heater 1
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
City of Anaheim
FINAL INSPECTIONS
Items below must be
DATE I INSPECTOR
before utilities are released
isuiiaing ivision 11X z
u >
0 0%
Do not occupy this building until the final inspections have been made.
Final Gas Test
Electrical Final
m ing Final 2 W 6�
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed7
Plumbing (Ground/Underfloor Water)
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
PARTIAL INSPECTIONS
Building Inspections
Floor (Joist/Girdem)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sionede
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear
Mechanical Inspections
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Group
o Plumbing (T Out)
Roug uc echanicai)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Framing (Only after Pibg., Ele., Mec. & Fire)
Plumbing Inspections
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service