Loading...
2089 W LAFAYETTE DR (2)Permit Types BLD ELE MEC PLM X Permit Number: OLD2022-05632 Issued: 11/28/2022 www.anaheim.neUbuilding (714)765-4626 Quarter Section: 39 CITY OF ANAHEIM BUILDING DMSION 200 S. ANAHEIM BLVD. (7141 765 -5153 Site Address: 2089WFAYETTE DR, ANAHEIM, CA 92801 Liegal Description: N TR 12102 BLK LOT 4 UN 129 TR 12102 LOT 4 UNIT 12 :.-..r :..... APN:'9_mss3777.190 Project Description: Plumbing for water heater change out Inside the garage Ling kea: Number of Stories: 1 Valuation: 0.00 Garage Area: Construction Types: WA Carport Area: Occupancy Groups: Balcony / Dock Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 167.00 People Associated with Project: Permit Applicant logan appel Owner MARTINEZ ANNABELLE 2089 W LAFAYETTE DR 129 .Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures - Qty Water Heater 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. City of Anaheim FINAL INSPECTIONS Items below must be DATE I INSPECTOR before utilities are released isuiiaing ivision 11X z u > 0 0% Do not occupy this building until the final inspections have been made. Final Gas Test Electrical Final m ing Final 2 W 6� Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed7 Plumbing (Ground/Underfloor Water) Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) PARTIAL INSPECTIONS Building Inspections Floor (Joist/Girdem) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sionede 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Mechanical Inspections Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Group o Plumbing (T Out) Roug uc echanicai) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Framing (Only after Pibg., Ele., Mec. & Fire) Plumbing Inspections Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service