Loading...
2156 S LOOM CTPermit Types BLD* ELE MEC PLM + I.. X Permit Number: BLD2022-04571 Issued: 09/27/2022 www.anaheim.neUbuilding (714)765-4626 Quarter Section: 109 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765-5153 Site Address:,2356 S LOOM CT, ANAHEIM, CA 92802 Legal'Descripti4in:;N:TR;17920 BLK LOT 1 LIN 19 LOT 1 OF TRACT 17920 OF APN:'93206419 Project Description: Residential EV Charger Level 2 Living Area: Number of Stories: Valuation: 0.00 Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 0.00 People Associated with Project: Permit Applicant Jose Medina 2356 S Loom Ct Anaheim, CA 92802 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. City of Anaheim Building Division Do not occupy this building until the final inspections have been made. INSPECTION DATE INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been sioned: Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sonnedi 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reint/Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless qmnnpd nffl Sewer Water Engineering Backflow, (Testable Only) Water Service FINAL INSPECTIONS DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 Fire Dept. Final (714) 765-5041 Water Engineering (714) 765-4591 Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) COA/Migation Measures Building Final (714 765-5153) Last Inspection -Final Only After Above Completed PARTIAL INSPECTIONS Building Inspections Mechanical Inspections Plumbing Inspections Electrical Inspections