Loading...
2607 W LINCOLN AVE (8)Permit Types BLD ELE I MEC I PLM X I X I X I X Permit Number: BLD2018-04446 Issued: 01/22/2019 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 19 Site Address: 2607 W LINCOLN AVE Legal Description: -SEC 12 T 4 R 11 POR SE1/4 C 200 SM (714) -5153 qi EIM `1k Project Description: Tenant Improvement: Demolition of interior non load bearing walls, demo existing restroom and 45 sq ft to construct new ADA restroom. Work done prior to obtaining permit(s). Electrical to relocate 200 main service panel. REF: INV2018-00392, COD2018-01814 Number of Stories 1 Valuation: $1,000.00 Construcion Types: VB, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 1,450.50 People Associated with Project: Owner SG HOLDINGS GROUP LLC 13800 ARIZONA ST #202 WESTMINSTER CA 92683 Engineer BEN PHAN 11392 PARK LN GARDEN GROVE CA 92845 Contractor LANDING CONSTRUCTION GROUP INC 13882 SUMMERWOOD PL GARDEN GROVE CA 92844 0000 Permit Applicant HOA NGUYEN 13882 SUMMERWOOD PL GARDEN GROVE CA Type Electrical Fixtures Qty Type Plumbing Fixtures Meter/Disc Sw - under 600 V, up to 200 amps Receptacle, switches, lights 1 Lavatory Water Closet 3 Repair/Drainage Alteration/Vent Piping Water Distribution Qty Type Mechanical Fixtures Qty 1 Ventilation Fan - <= 300 cfm on single duct 1 1 1 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_combo PNEIM 2 FINAL INSPECTIONS DATE INSPECTOR Cityof Anaheim /01,P� All applicable items below must be signed before utilities are released Building Division h z U ' �DGNDED Do not occupy this building until the final inspections have been made. Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items hyl6een signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/FormsITrenches (Footings) COA1Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned: Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (ReinE/Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mac. & Fre) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sioned off) Sewer Water Engineering Backflow (Testable Only) Water Service �A •A cc