Loading...
230 S MONUMENT STo Permit Types BLD ELE MECf9PLM X X Permit Number: DLD2023.00 Issued: 02/02/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 27 Site Address: 230 S MONUMENT ST, ANAHEIM, CA 92804 Legal Destirlptiow N TR 1940 BLK LOT 54 APN: 12704403 ' CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765-5153 Project Description: Residential Photovoltaic System with Microinverters E 9\/ 423 9 Living Area: Number of Stories: Valuation: 10,000.00 Garage Area: Construction Types: Carport Area: Occupancy Groups: . Balcony / Deck Area: Fire Sprinldered: Cool Roof: Total Fees paid for Permit: 167.00 People Associated with Project: Contractor EFFECT ENERGY INC 1007 W GROVE AVE STE D ORANGE, CA 92865 Permit Applicant Svetoslav Stefenov 1007 W Grove Ave D ORANGE, CA 92865 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Microinverter 10 Sub Panel/Temp Pwr - Under 600 V. up to 1 200 amps The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. 1" r - a P�PNEIM �q< City of Anaheim o� io Building DivisionF y'Z u > DED' Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765.5153) Last Inspection -Final Only After Above Completed �✓ Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been Mane& 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service