Loading...
516 S MORNINGSTAR DRI&- it Types BLD ELEMEC PLM X Permit Number: OLD2023-02744 Issued: 06/05/2023 www.anaheim.net/building (714)765.4626 Quarter Section: 225 CITY OF ANAHEIM Site Address: 516 S MORNINGSTAR DR, ANAHEIM, CA 92808 Legal Description:'N TR 12988 SLK LOT 67 APN:35423243 Project Description: Residential EV Charger Level 2 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714)765-5153 Living Area: Number of Stales: Valuation: 0.00 Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinldered: Cool Roor Total Fns paid for Permit, 0.00 People Associated with Project: Contractor CZ ELECTRIC 180 N. ROSE BLOSSOM LANE ANAHEIM, CA 92807 Permit Applicant Zoltan Csemus I Type Electrical Fixtures Qty Type Plumbing Fixtures Qly Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�p.HE1M Cil City of Anaheim o� io Building Division z u a �DUNDEC) �$�n Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE SPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 6 3 ,�• Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE TINSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been signed: Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unlps-.; Maned offl Sewer Water Engineering Backflow (Testable Only) Water Service