941 E MASON LN (5)Permit Types
BLD ELE MEC PLM
X X
Permit Number: BLD2017-05502
Issued: 12/08/2017
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 107
Site Address: 941 E MASON LN (TEMP. POWER)
Legal'Description:
C
'200 S A1�AHEIM4LVD.
(714) 765 - 5153
EIM
Project Description: Miscellaneous: 1,440 s.f. sales trailer with accessibly compliant restroom for "LEWIS STREET
TOWNHOMES." REF: BLD2017-04167
Number of Stories 1 Valuation:
$15,000.00
Construcion Types:
VB. ,
Fire Sprinklered?
No
Cool Roof
No
Total Fees paid for Permit:
612.22
People Associated with Project:
Engineer RAYMON GERGES THREE HUGHES IRVINE CA 92618
Engineer KEVIN C DAY 12808 SOUTH 600 EAST DARPER UT 84020
Engineer -�HUAN NGUYENA ' "'' 4400 CAMPUS DR. NEWPORT BEACH CA 92660
Engineer VETTE M WIL'SO � ° ' �I 1100 MAIN STREET SUITE A WATSONVILLE CA 95076
Engineer BRIAN R,OVERL pYq , j 25635 CALLE LA FUENTE SAN JUAN CAPISTRANO CA 92675
Contractor RK CONSTRUCTION SERVICES INC 3001 BISHOP DR 100 SAN RAMON CA 94583
Permit Applicant,-,JRUMA
LAN BAIRD i�l J j ��
Type t� EleJctrir al Fixtured Qty: �Typ�e p Plumbing Fixtures Qry Type Mechanical Fixtures Qty
o _ _
Water Main per 100 ft. 1
Sewer per 100 ft. 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbid_permit_combo
City of Anaheim
Building Division
Do not occuov this buildinq until the final insaections have been made.
INSPECTION I DATE IINSPECTOR
Do not pour concrete until the following applicable items have been signed:
Plumbing (Ground/Underfloor Drain Waste) /
Electrical Ground ElectrodelUfer
Setback/Forms/Trenches (Footings) IT
Do not install subfloor or pour floor slab until the follwing applicable items fiave been
Plumbing (Ground/Underfloor
Underfloor Rouqh Gas
FINAL INSPECTIONS I DATE I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-5041
Fire Dept. Final (714) 765-5041
Water Engineering (714) 765-4591
Sub LIst/Bus. Lic. (714) 765-5194 (Allow 10 business days)
OAIMination Measures
ding Final (714 765-5163)
Inspection -Final Only After Above Completed
PARTIAL INSPECTIONS
Electrical (Underground Conduit) Buildinci Ins ePU� M I T EXPIRED
Pre -slab (Compaction/Membrane Reinf.)
Floor (JolstlGlyders) I NIS p E (� N
Underfloor Insulation (Raised Foundation Only) �-I n �-F�v�
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
st Floor Shear
Dept.)
Floor Shear
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Penetrations (Ele, Mec & Plbg)
Lath
Lath
U Service Meter -(Meter will be set within 2-3
days after approval) Excludes New
Exterior Plaster (Brown Coa
T -Bar (Strutt., Ele., or Mec.)
Sewer
Service
Backflow (Testable Only)
Mechanical Inspections
Plumbing Inspections
Electrical Inspections