943 E MASON LN (10)Permit Types
BLD ELE MEC PLM
X I X X X
Permit Number: BLD2018-05004
Issued: 06/01/2018
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: '
Site Address: 943 E MASON LN 60,61,62,63,64
Legal Description:
C
nuip��uJu�v�a��
200 3�ANAHEI �l
(714) 765 - 5153
EIM
Project Description: New Residential Construction: Construct 8,250 sf. 5 unit condominium with 2,218 sf. garages. BLDG -7
LOTS 96-100 REF: BLD2017-02019
Living Area: 8,250 Dwelling Units: 5 Valuation: $1,000,000.00
Garage Area 2,218 > Construcion Types: VB, ,
Balcony / Deck Area: 196 Occupancy Groups: R3, S2, , ,
Fire Sprinklered? Yes
Cool Roof No
Total Fees paid for Permit: 0.00
People Associated with Project:
Contractor
TRUMARK CONSTRUCTION SERVICES INC
3001 BISHOP DR 100 SAN RAMON CA 94583
Permit Applicant
MAGGI KIBBEE
Qty
Engineer
JOHNNY R CONAWAY
700 S FLOWER ST STE 2580 LOS ANGELES CA 90017
Engineer
CHRISTOPHER TEXTER
17911 VON KARMAN AVE STE 200 IRVINE CA 92614
Engineer
RAYMON GERGES
THREE HUGHES IRVINE CA 92618
Engineer
ROBERT L WHEELER
THREE HUGHES IRVINE CA 92618
Engineer
BEAT ARNET
520 E GOETZ AVE STE A SANTA ANA CA 92707
Engineer
KEVIN HILLS
THREE HUGHES IRVINE CA 92618
Engineer
HUAN NGUYEN
2150 TAHQUITZ CANYON WAY 9 NEWPORT BEACH CA 92660
Engineer
BLAKE J ELLIOTT
131 CALLE IGLESIA STE 200 SAN CLEMENTE CA 92672
Type Electrical Fixtures
Qty
Type Plumbing Fixtures
Qty
Type Mechanical Fixtures
Qty
Meter/Disc Sw - under 600 V, up to 200
6
Bath Tub
5
Heating Appliances, including vent
5
amps
Shower
.6
Heating/Cooling Coil
5
Sub Panel/Temp Pwr - < 600 V, 0 < amps
6
Lavatory
20
Compressor/Boiler - up to 15 hp
5
<= 200
New or total rewire -1 or 2 family
8,250
Water Closet
15
Residential Registers
52
New or total rewire -garage/carport
2,218
Kitchen Sink
5
Ventilation Fan - <= 300 cfm on single duct
34
Motors - up to 1 h.p.
5
Garbage Disposal
5
Receptacle, switches, lights
15
Repair/Drainage Alteration/Vent Piping
5
Meter/Disc Sw - < 600 V, 200 to 500 amps
1
Dishwasher
5
Washing Machine Rough
5
Water Heater
5
Water Distribution
5
Gas System (1-5 outlets)
5
Water Main per 100 ft.
5
Sewer per 100 ft.
5
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit _combo
P�PrtE1M Cq(
Cityof Anaheim
Building Division F i
U >
�DUNDE0
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE I INSPECTOR
All applicable Items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final W It
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION I DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days)
Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned:
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoistIGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned:
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear / /Q
Roof (Sheathing/Diaphragm/Frame) /
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath s
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless slaned nff)
Sewer
Water Engineering Backflow (Testable Only)
Water Service