Loading...
945 E MASON LN (11)Permit Types BLD ELE MEC PLM X I X I X X Permit Number: BLD2018-05024 Issued: 06/01/2018 INSPECTION REQUEST LINE: (714) 765 - 4626. Quarter Section: Site Address:; ,945 E MASON LN 65,66,67,68,69 Legal �Descriptioit: CITY" IRANA,"HEIM BUI1DINGUDJVfISIPN 200 SQA AHEIM�LVD. (714) 765 - 5153 Project Description: New Residential Construction: Construct 8,250 sf. 5 unit condominium with 2,218 sf. garages. BLDG -25 LOTS 101-105 REF: BLD2017-02019 3001 BISHOP DR 100 SAN RAMON CA 94583 Permit Applicant Living Area: 8,250 Dwelling Units: 5 Valuation: $1,000,000.00 Garage Area 2,218 Construcion Types: VB, , Balcony / Deck Area: 196 Occupancy Groups: R3, U, , , RAYMON GERGES Fire Sprinklered? Yes ROBERT L WHEELER Cool Roof No BEAT ARNET Total Fees paid for Permit: 0.00 People Associated with Project: Contractor TRUMARK CONSTRUCTION SERVICES INC 3001 BISHOP DR 100 SAN RAMON CA 94583 Permit Applicant MAGGI KIBBEE Qty Engineer JOHNNY R CONAWAY 700 S FLOWER ST STE 2580 LOS ANGELES CA 90017 Engineer CHRISTOPHER TEXTER 17911 VON KARMAN AVE STE 200 IRVINE CA 92614 Engineer RAYMON GERGES THREE HUGHES IRVINE CA 92618 Engineer ROBERT L WHEELER THREE HUGHES IRVINE CA 92618 Engineer BEAT ARNET 520 E GOETZ AVE STE A SANTA ANA CA 92707 Engineer KEVIN HILLS THREE HUGHES IRVINE CA 92618 Engineer HUAN NGUYEN 2150 TAHQUITZ CANYON WAY 9 NEWPORT BEACH CA 92660 Engineer BLAKE J ELLIOTT 131 CALLE IGLESIA STE 200 SAN CLEMENTE CA 92672 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Meter/Disc Sw - under 600 V, up to 200 6 Bath Tub 5 Heating Appliances, including vent 5 amps Shower 6 Heating/Cooling Coil 5 Meter/Disc Sw - < 600 V. 200 to 500 amps 1 Lavatory 20 Compressor/Boiler - up to 15 hp 5 Sub Panel/Temp Pwr - < 600 V, 0 < amps 6 Water Closet 15 Residential Registers 52 <= 200 Receptacle, switches, lights 15 Kitchen Sink 5 Ventilation Fan - <= 300 cfm on single duct 34 New or total rewire - 1 or 2 family 8,250 Garbage Disposal 5 New or total rewire - garage/carport 2,218 Repair/Drainage Alteration/Vent Piping 5 Motors - up to 1 h.p. 5 Dishwasher 5 Washing Machine Rough 5 Water Heater 5 Water Distribution 5 Gas System (1-5 outlets) 5 Water Main per 100 ft. 5 Sewer per 100 ft. 5 .' . The permit shall expire by limitation and become null and void if the building or work has not passed final inspectiori 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld—Permit combo P�PNFIM Cq< Cityof Anaheim o� io Building. Division F 3 > �OGNDED Do not occupy this buildina until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable Items below must be signed before utilities are relea ed Final Gas Test "Xn F16 Electrical Final .9 Plumbing Final Mechanical Final//7//% Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub ListlBus. Lic. (714) 765.5194 (Allow 10 business days) Setbaek/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned: Building Final (714 765.5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildina Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical / Rough Electrical Rough COA/Mitagation Measures Plumbina Inspections Framing (Only after Plbg., Ele., Mec. &Fire) / Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall ZIZ Drywall Penetrations (Ele, Mec & Plbg) / Interior Lath y Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Strutt., Ele., or Mec.) Grease Interceptor (Do not backfill unless sioned offi Sewer Water Engineering Backflow (Testable Only) Water Service