Loading...
963 E MASON LN (15)Permit Types BLD ELE MEC PLM X I X X X Permit Number: BLD2017-04362 Issued: 02/09/2018 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 0 - ANAH CIT��Y'/EIM BUILD NjDIVISION 200 SAN, AHEIMsBLVD. (714) 765 - 5153 Site.Address: 963 E MASON LN 90 Legal, scription: 1 Project Description: New Residential Construction: (Plan 1 R) Construct new 3 -story with roof top mezzanine, 2 bedroom, 2.5 bath 1,554 sf. single family residence with 439 sf. garage Living Area: 1,554 Valuation: $200,000.00 Garage Area 439 Construcion Types: VB, , Occupancy Groups: R3, S2, , , Fire Sprinklered? Yes Cool Roof No Total Fees paid for Permit: 7.700.15 People Associated with Project: Contractor TRUMARK CONSTRUCTION SERVICES INC 3001 BISHOP DR 100 SAN RAMON CA 94583 Permit Applicant MAGGI KIBBEE Engineer JOHNNY R CONAWAY 700 S FLOWER ST STE 2580 LOS ANGELES CA 90017 Engineer BLAKE J ELLIOTT 131 CALLE IGLESIA STE 200 SAN CLEMENTE CA 92672 Engineer ROBERT L WHEELER THREE HUGHES IRVINE CA 92618 Engineer KEVIN HILLS THREE HUGHES IRVINE CA 92618 Engineer BEAT ARNET 520 E GOETZ AVE STE A SANTA ANA CA 92707 Engineer HUAN NGUYEN 4400 CAMPUS DR. NEWPORT BEACH CA 92660 Engineer CHRISTOPHER TEXTER 17911 VON KARMAN AVE STE 200 IRVINE CA 92614 Engineer RAYMON GERGES THREE HUGHES'IRVINE CA 92618 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Meter/Disc Sw - under 600 V, up to 200 1 Bath Tub 1 Heating Appliances, including vent 1 amps Shower 1 Heating/Cooling Coil 1 Sub Panel/Temp Pwr - < 600 V, 0 < amps 1 Lavatory 4 Compressor/Boiler - up to 15 hp 1 <= 200 New or total rewire - 1 or 2 family 1,554 Water Closet 3 Residential Registers 10 New or total rewire - garage/carport 439 Kitchen Sink 1 Ventilation Fan - <= 300 cfm on single duct 7 Motors - up to -1 h.p. 1 Garbage Disposal 1 Repair/Drainage Alteration/Vent Piping 1 Dishwasher 1 Washing Machine Rough 1 Water Heater 1 Water Distribution 1 Gas System (1-5 outlets) 1 Water Main per 100 ft. 1 Sewer per 100 ft. 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_combo City of Anaheim Building Division Do not occupy this building until the final inspections have been made. INSPECTION DATE INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follvWAng applicable iteNhive Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Y!8'y>�,ywo UL 3'— :r -I I -iir �,AAA Do not cover or conceal the work below until the following applicable items have 1st Floor Shear 2nd Floor Shear Roof (Sheathing FINAL INSPECTIONS I DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 Fire Dept. Final (714) 765-5041 Fater Engineering (714) 765.4591 ub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) COA/Migation Measures Building Final (714 765-5153) Inspection -Final Only After Above Completed` �l 4-T ��AI"ALast PARTIAL INSPECTIONS Buildinq Inspections 7.271 8 EV 7.. Sit c4L DAA 4 -n,> .aA Mechanical Inspections Rough Plumbing (Top Out) t' zit - f r L Rough Duct (Mechanical) g--z1-►a Rough Mechanical-L(tiQ /Q Rough Electrical Rough COAIMitagation Measures Framing (Only after Plbg., Ele., Mac. & Fire)1,41L /r LA Insulation (Sound/Energy) 9-5-/8 Do not tape or plaster until the following applicable items have been signed: Drywall q -I 18' m A-* Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath gyp-/g14-A- Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service Plumbinq Inspections Electrical Inspections