Loading...
963 E MASON LN (16)Permit Types t1ElAy C4�� BLD ELE MEC PLM �� r X X X X o`` o Permit Number: BLD2017-04195�r_ i Issued: 02/09/2018 INSPECTION REQUEST LINE: CITM O -F 'ANAHEIM (714) 765 - 4626 BUI11-DINGjDIVISION 200 S�ANAHEIM>BLVD. Quarter Section: (714) 765 - 5153 Site Address: 963E MASON_ LN 91 Legal. Ubscriptiom Project Description: New Residential Construction: (Plan 3R) Construct new 3 -story with roof top mezzanine, 3 bedroom, 2.5 bath 1,772 sf. single family residence with 447 sf. garage and 68 sf. deck. (Ref:BLD2017-02019) Living Area: 1,772 Valuation: $200,000.00 Garage Area 447 Construcion Types: VB, , Balcony / Deck Area: 68 Occupancy Groups: R3, S2, , , Fire Sprinklered? Yes Cool Roof No Total Fees paid for Permit: 8,701.24 People Associated with Project: Contractor TRUMARK CONSTRUCTION SERVICES INC 3001 BISHOP DR 100 SAN RAMON CA 94583 Permit Applicant MAGGI KIBBEE Engineer JOHNNY R CONAWAY 70G S FLOWER ST STE 2580 LOS ANGELES CA 90017 Engineer BLAKE J ELLIOTT 131 CALLE IGLESIA STE 200 SAN CLEMENTE CA 92672 Engineer ROBERT L WHEELER THREE HUGHES IRVINE CA 92618 Engineer KEVIN HILLS THREE HUGHES IRVINE CA 92618 Engineer BEAT ARNET 520 E GOETZ AVE STE A SANTA ANA CA 92707 Engineer HUAN NGUYEN 4400 CAMPUS DR. NEWPORT BEACH CA 92660 Engineer CHRISTOPHER TEXTER 17911 VON KARMAN AVE STE 200 IRVINE CA 92614 Engineer RAYMON GERGES THREE HUGHES IRVINE CA 92618 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Meter/Disc Sw - under 600 V, up to 200 1 Bath Tub 1 Heating Appliances, including vent 1 amps Sub Pwr - < 600 V. 0 < amps 1 Shower 1 Heating/Cooling Coil 1 0POanelfremp Lavatory 4 Compressor/Boiler - up to 15 hp 1 New or total rewire -1 or 2 family 1,772 Water Closet 3 Residential Registers 11 New or total rewire - garage/carport 447 Kitchen Sink 1 Ventilation Fan - — 300 cfm on single duct 7 Motors - up to 1 h.p. 1 Garbage Disposal 1 Repair/Drainage Alteration/Vent Piping 1 Dishwasher 1 Washing Machine Rough 1 Water Heater 1 Water Distribution 1 Gas System (1-5 outlets) 1 Water Main per 100 ft. 1 Sewer per 100 ft. 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_combo P�Pt1EIAI Cq< FINAL INSPECTIONS DATE INSPECTOR Cityof Anaheim D� �o All applicable items below must be signed before utilities are released Building Division F z Final Gas Test u > Electrical Final 1� Plumbing Final ti �DGNDED fah^ Mechanical Final l.;i'g-/ ,� {o�"Aim— Cross Connection Control (714) 765-4280 Do not occupy this building until the final inspections have been made. Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) - �• ater Engineering (714) 765-4591 Electrical Ground Electrode/Ufer . �• ub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) 0 COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items ave been si a Building Final (714 765-5153) 0 Last Inspection-Final Only After Above Completed ;19 .£d Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections 7 =-7-yg mit% T48kA_ oKA4 -r* c.W. .w-"V jV_ AM" Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) '` Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been s' e • 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mac & Pibg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor ass sinned offl Sewer Water Engineering Backflow (Testable Only) Water Service �•�