Loading...
1276 S MAC DUFF ST (2)CITY OF ANAHEIM r ' - - I -LBUILDING DIVISION Permit Number: BLD2023.03179 200 S. ANAHEIM BLVD. Issued: 06/27/2023 (7141 765 -5153 www.anaheim.net/building (714)7654626 Quarter Section: 22 She Address: 1276 S MAC DUFF ST, Anaheim, CA 92804 Legal Description: N TR 18097 BLK LOT 1 UN 24 LOT 1 OF TRACT 18097 OF APN: 93552235 Project Description: Residential EV Charger Level 2 Living Area: Number of Stories: Valuation: 0.00 Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony! Deck Area: Fire Sprinklered: Cool Root: Total Fees paid for Permit: 0.00 People Associated with Project: Contractor THE RECESSED LIGHTING COMPANY 3943 IRVINE BLVD STE 296 IRVINE, CA Permit Applicant Andrew Schmitz 3943 IRVINE BLVD STE 296 Irvine. CA 92602 Type Electrical Fixtures Qty Type Plumbing Fbdures Qty Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�Ph1E111q C,q� City of Anaheim o� �o Building Division F i u > �OGA,oEO �$y� Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE I +R All applicable Items below must be signed before utilities are release Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianeds Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been s' anedi 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Strutt., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service