1441 S MANCHESTER AVE (19)Permit Types
BLD ELE MEC PLM
X X X I X
Permit Number:13LD2018-03490
Issued: 03/13/2019
www.anaheim.net/building
(714)765.4626
Quarter Section: 86
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
1714) 765.5153
Site Addiei` is 1441 S MANCHESTER AVE, ANAHEIM, CA 92802
L-9 Description:
W
APN: 0821706�4
Project Description: New Commercial Construction: 136,370 sq ft for new six level hotel with 53,578 sq ft two-level subterranean garage.
3,808 sq ft attached porte cochere.
Living Area: Number of Stories: 0 Valuation: 30,000,000.00
Garage Area: Construction Types: IA
Carport Area: Occupancy Groups: S1, B. A3, R1, A2
Balcony/ Deck Area: Fire Sprinklered: Yes
Cool Roof Total Fees paid for Permit: 682,857.20
People Associated with Project:
Permit Applicant
AMIL PATEL
Type Plumbing Fixtures
Engineer - Electrical
RYAN J GALAZ
PO BOX 6390201609131440579200 LA QUINTA, CA 92248
Engineer
THOMAS D VANDORPE
295 N RAMPART STREET SUITE A 200310291304341800 ORANGE, CA 92868
Engineer - Mechanical
SANYA PHATCHARAKITTI
PO BOX 6390201609131432384200 LA QUINTA, CA 92248
Engineer - Civil
ANDREW J KANN
201407081630228790
Architect
JAMES HAILEY
201105271529229920
Type Electrical Fixtures
Qty
Type Plumbing Fixtures
Qty
Generators/Transformers - over 10 hp,
1
Backflow Exterior - 2 Inch or less
1
over 75 We
1
Backflow Exterior - over 2 inch
2
Meter/Disc Sw - > 600 V. over 2500 amps
1
Shower
16
Motors - up to 1 h.p.
283
Backflow Interior - 2 Inch or less
19
Motors - over 1 h.p. to 10 h.p.
15
Bar Sink
135
Motors - over 10 h.p.
16
Bath Tub
209
Receptacle, switches, lights
1523
Dishwasher
1
Sub PanetrTemp Pwr - < 600 V, 0 <
18
amps - 200
Drinking Fountain
2
Sub Panel/Temp Pwr - < 600 V, 200 <
7
Floor Drain
44
amps — 500
Floor Sink
28
Sub PaneVremp Pwr - < 600 V. 500 <
2
amps -1000
Gas System (1-5 outlets)
1
Sub PaneVTemp Pwr - > 600 V, 1000,c
1
Gas System (additional outlets)
13
amps — 2500
Gas Yard Piping
1
Grease Interceptorfrrap 2
Kitchen Sink 23
Laundry Tray
2
Lavatory
246
Rainwater, Overflow Drains
24
Repair/Drainage AHeretion/Vent Piping
1
Sand Interceptor/Trap
1
Service, Mop, Slop Sink
1
Sewer per 100 ft.
11
Shower
16
Urinal
6
Washing Machine Rough
7
Water Closet
247
Water Heater
2
Water Softener
1
Mechanical Fixtures Qh
Commercial Hoods (including ducts) ,
Compressor/Boiler - up to 15 hp 1f
Evaporative Cooler (not portable) 1
Ventilation Fan - - 300 cfm on single duct 22.
Ventilation Fan - > 300 cfm on single duct 1:
"Please refer to the record on file with the City for a complete work item list or access your record at https://aca.anaheim.not/CfizenAccess/ '_
P�pHEIM C9<
City of Anaheim .
c� o
Building Division y
U >i
I
�D��►DED �$y^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final�� 2 ��
Plumbing Final
Mechanical Final r
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
s,Z�
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
I�
COA/Migation Measures
Do not install subfloor or pour floor slab until the folMring applicable items have been
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
/p
Plumbing (Ground/Underfloor Water) .2� c C
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit) y
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
." c-
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been snana&
1st Floor Shear
Z�
Firesprinkler (Rough) (Fin; Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
c A-
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Pibg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Pibg)
-z
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Cnnainjetean
lC L
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
3 -
L
Sewer
Water Engineering Backflow (Testable Only)
Water Service