Loading...
1441 S MANCHESTER AVE (19)Permit Types BLD ELE MEC PLM X X X I X Permit Number:13LD2018-03490 Issued: 03/13/2019 www.anaheim.net/building (714)765.4626 Quarter Section: 86 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. 1714) 765.5153 Site Addiei` is 1441 S MANCHESTER AVE, ANAHEIM, CA 92802 L-9 Description: W APN: 0821706�4 Project Description: New Commercial Construction: 136,370 sq ft for new six level hotel with 53,578 sq ft two-level subterranean garage. 3,808 sq ft attached porte cochere. Living Area: Number of Stories: 0 Valuation: 30,000,000.00 Garage Area: Construction Types: IA Carport Area: Occupancy Groups: S1, B. A3, R1, A2 Balcony/ Deck Area: Fire Sprinklered: Yes Cool Roof Total Fees paid for Permit: 682,857.20 People Associated with Project: Permit Applicant AMIL PATEL Type Plumbing Fixtures Engineer - Electrical RYAN J GALAZ PO BOX 6390201609131440579200 LA QUINTA, CA 92248 Engineer THOMAS D VANDORPE 295 N RAMPART STREET SUITE A 200310291304341800 ORANGE, CA 92868 Engineer - Mechanical SANYA PHATCHARAKITTI PO BOX 6390201609131432384200 LA QUINTA, CA 92248 Engineer - Civil ANDREW J KANN 201407081630228790 Architect JAMES HAILEY 201105271529229920 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Generators/Transformers - over 10 hp, 1 Backflow Exterior - 2 Inch or less 1 over 75 We 1 Backflow Exterior - over 2 inch 2 Meter/Disc Sw - > 600 V. over 2500 amps 1 Shower 16 Motors - up to 1 h.p. 283 Backflow Interior - 2 Inch or less 19 Motors - over 1 h.p. to 10 h.p. 15 Bar Sink 135 Motors - over 10 h.p. 16 Bath Tub 209 Receptacle, switches, lights 1523 Dishwasher 1 Sub PanetrTemp Pwr - < 600 V, 0 < 18 amps - 200 Drinking Fountain 2 Sub Panel/Temp Pwr - < 600 V, 200 < 7 Floor Drain 44 amps — 500 Floor Sink 28 Sub PaneVremp Pwr - < 600 V. 500 < 2 amps -1000 Gas System (1-5 outlets) 1 Sub PaneVTemp Pwr - > 600 V, 1000,c 1 Gas System (additional outlets) 13 amps — 2500 Gas Yard Piping 1 Grease Interceptorfrrap 2 Kitchen Sink 23 Laundry Tray 2 Lavatory 246 Rainwater, Overflow Drains 24 Repair/Drainage AHeretion/Vent Piping 1 Sand Interceptor/Trap 1 Service, Mop, Slop Sink 1 Sewer per 100 ft. 11 Shower 16 Urinal 6 Washing Machine Rough 7 Water Closet 247 Water Heater 2 Water Softener 1 Mechanical Fixtures Qh Commercial Hoods (including ducts) , Compressor/Boiler - up to 15 hp 1f Evaporative Cooler (not portable) 1 Ventilation Fan - - 300 cfm on single duct 22. Ventilation Fan - > 300 cfm on single duct 1: "Please refer to the record on file with the City for a complete work item list or access your record at https://aca.anaheim.not/CfizenAccess/ '_ P�pHEIM C9< City of Anaheim . c� o Building Division y U >i I �D��►DED �$y^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final�� 2 �� Plumbing Final Mechanical Final r Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer s,Z� Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) I� COA/Migation Measures Do not install subfloor or pour floor slab until the folMring applicable items have been Building Final (714 765-5153) Last Inspection-Final Only After Above Completed /p Plumbing (Ground/Underfloor Water) .2� c C Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) y Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) ." c- 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been snana& 1st Floor Shear Z� Firesprinkler (Rough) (Fin; Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical c A- Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Pibg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Pibg) -z Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Cnnainjetean lC L Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor 3 - L Sewer Water Engineering Backflow (Testable Only) Water Service