Loading...
2064 S MARGIE LNPermit Types BLD ELE. MEC PLM I X Permit Number. BLD2023-03226 Issued: 06/29/2023 www.anaheim.net/building (714)765-0626 Quarter Section: 67 Site Address: 2064 S MARGIE LN, ANAHEIM, CA 92802 Legal Description: N TR 2575 BLK LOT 86. APN:09053303 Project Description: Residential EV Charger Level 2 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765-5153 Living Area: Number of Stories: Valuation: 0.00 Garage Area: Constriction Types: Carport Area: Occupancy Groups: Balcony/ Deck Area: Fire Spdnklered: Cool Roof: Total Fees paid for Permit: 0.00 People Associated with Project: Contractor QUACOM ELECTRIC LLC 2372 MORSE AVENUE #366 IRVINE, CA Permit Applicant Ben Quan Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�Pt1EIAq CSC Cityof Anaheim O� io Building Division F 2 u a �oGNDEo �$yn Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE,,, _IUSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 7 3 OYZj Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub LisUBus. Lie. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been seaneds 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections ' 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service