2127 W MINERVA AVE (7)Permit Types
BLD ELE MEC PLM
X X
PenMYNumber. BLD2023-03057
Issued: 06120/2023
www.anaheim.net/building
(714)765-4626
Quarter Section: 41
Site Address: 2127 W MINERVA AVE, Anaheim, CA 92804
Legal Description: N TR 2537 BLK LOT 105
APN:12832309
CITY OF ANAHEIM
BUILDING DMSION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Photovoltaic System: Remove and reinstall existing solar system for remof. REF: BLD2023-02797
Living Area: Number of Stories: 1 Valuation: 1,000.00
Garage Area: Construction Types: NIA
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinklered:
Cool Roof: Total Fees paid for Permit: 199.50
People Associated with Project:
Contractor SOLAR PRICE DISCOVERY INC DBA SOLAR D 18653 VENTURA BLVD SUITE 260201702231630403520 TARZANA, CA 91356
Permit Applicant Robert Friend
Owner RATTANAVILAY TIM THIPADITH 2127 W MINERVA AVE
Type Electrical Fbdures Qty Type Plumbing Fbdures Qty Mechanical Fixtures City
Miscellaneous Items 1
The permit shall expire by limitation and become null and vold N the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
P�pHEIM �qC
City of Anaheim D� io
Building Division F z
u >
DED
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub Ltst/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sionedo
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girdem)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sionedo
1st Floor Shear
Firesprinkler (Rough) (Fire Dept:)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath.
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service