2209 W MIDWOOD LN (2)Permit Types pN F R7 c
BLD ELE MEC PLM
X X X oo
Permit Number: BLD2018-03975 :
Issued: 08/31/2018 CITY�O A : -A EIM
INSPECTION REQUEST LINE: EiUI `D.ING DIVISrN
(714) 765 - 4626 `�K'�
200
Quarter Section: 36 Y S. ANAHEIMsBLVD.
'Ex� (714) 765-5153
Site,Address:. 2209.W MIDWOOD LN 4
Legal :Description: N TR.2319 LOT 33
Project Description: Residential Remodel: Kitchen and (2) bathroom remodels to replace 400 sq ft of drywall, retile (2) showers
with Electrical and Plumbing for fixture upgrades. Electrical to upgrade main service panel to 200 amps with total house rewire.
Plumbing to change existing water heater to a tankless water heater and whole house repipe.
Valuation: $5,000.00
Construcion Types: NIA, ,
Total Fees paid for Permit: 970.53
People Associated with Project:
Owner FRED W BUSALD 2209 W MIDWOOD LN ANAHEIM CA 92804-6407
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
New or total rewire -1 or 2 family 1,400 Shower 1
Water Closet 2
Kitchen Sink 1
Water Heater 1
Water Distribution
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit_combo
IoJ91�2V20 .
P�PHE1M �q<
City of Anaheim D� �o
Building Division F i
U a
NDED
Do not occupy this buildinq until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 7654041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Mlgation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
s' e •
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildinq Inspections
#Akav-�'O COWL IWA15 Pa L 11 I q
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical 7
Rough Electrical
Rough COAIMitagation Measures
Plumbinq Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Constructmon
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not hackfill unless sinned ofn
Sewer
Water Engineering Backflow (Testable Only)
Water Service