Loading...
2209 W MIDWOOD LN (2)Permit Types pN F R7 c BLD ELE MEC PLM X X X oo Permit Number: BLD2018-03975 : Issued: 08/31/2018 CITY�O A : -A EIM INSPECTION REQUEST LINE: EiUI `D.ING DIVISrN (714) 765 - 4626 `�K'� 200 Quarter Section: 36 Y S. ANAHEIMsBLVD. 'Ex� (714) 765-5153 Site,Address:. 2209.W MIDWOOD LN 4 Legal :Description: N TR.2319 LOT 33 Project Description: Residential Remodel: Kitchen and (2) bathroom remodels to replace 400 sq ft of drywall, retile (2) showers with Electrical and Plumbing for fixture upgrades. Electrical to upgrade main service panel to 200 amps with total house rewire. Plumbing to change existing water heater to a tankless water heater and whole house repipe. Valuation: $5,000.00 Construcion Types: NIA, , Total Fees paid for Permit: 970.53 People Associated with Project: Owner FRED W BUSALD 2209 W MIDWOOD LN ANAHEIM CA 92804-6407 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty New or total rewire -1 or 2 family 1,400 Shower 1 Water Closet 2 Kitchen Sink 1 Water Heater 1 Water Distribution The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_combo IoJ91�2V20 . P�PHE1M �q< City of Anaheim D� �o Building Division F i U a NDED Do not occupy this buildinq until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 7654041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Mlgation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been s' e • Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections #Akav-�'O COWL IWA15 Pa L 11 I q Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical 7 Rough Electrical Rough COAIMitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Constructmon Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not hackfill unless sinned ofn Sewer Water Engineering Backflow (Testable Only) Water Service