2413 W MARIAN AVE (3)P�PNEIM �qC
City of Anaheim o� �o
Building Division F i
U >
.,
DE0 %aye
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final All,
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
,? /$
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
,211
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
�iS' /S
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable ite have been
si n d:
Building Final (714 765-5153)/Z�Z2
Last Inspection-Final Only After Above Completed
f/1
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)=,?-
PARTIAL INSPECTIONS
Building Inspections
13
Floor (Joist/Girders)
-1/3#3
5-17-!
Underfloor Insulation (Raised Foundation Only)
3 /;UL4
r lei
Floor Nailing (Raised Foundation Only)
? y /3
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:
1st Floor Shear
o?M !3
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear
Mechanical Inspections
Roof (Sheathing/Diaphragm/Frame)
9 S
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
4.4
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Framing (Only after Plbg., Ele., Mec. & Fire)
f /�
Plumbing Inspections
-11 Ad rAV 4&e.2 A-A
Insulation (Sound/Energy)f
T /
Do not tape or plaster until the following applicable items have be n signed:
Drywall
off/
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
?,
Exterior Lath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes NewAA
Construction'>7
/9 /$
Electrical Inspections
•? l3
Exterior Plaster (Brown Coat)
9 9 f$
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless Moned offi
Sewer
Water Engineering Backflow (Testable Only)
Water Service