Loading...
2413 W MARIAN AVE (3)P�PNEIM �qC City of Anaheim o� �o Building Division F i U > ., DE0 %aye Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final All, Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) ,? /$ Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer ,211 Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) �iS' /S COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable ite have been si n d: Building Final (714 765-5153)/Z�Z2 Last Inspection-Final Only After Above Completed f/1 Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.)=,?- PARTIAL INSPECTIONS Building Inspections 13 Floor (Joist/Girders) -1/3#3 5-17-! Underfloor Insulation (Raised Foundation Only) 3 /;UL4 r lei Floor Nailing (Raised Foundation Only) ? y /3 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed: 1st Floor Shear o?M !3 Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Mechanical Inspections Roof (Sheathing/Diaphragm/Frame) 9 S Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) 4.4 Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Framing (Only after Plbg., Ele., Mec. & Fire) f /� Plumbing Inspections -11 Ad rAV 4&e.2 A-A Insulation (Sound/Energy)f T / Do not tape or plaster until the following applicable items have be n signed: Drywall off/ Drywall Penetrations (Ele, Mec & Plbg) Interior Lath ?, Exterior Lath Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes NewAA Construction'>7 /9 /$ Electrical Inspections •? l3 Exterior Plaster (Brown Coat) 9 9 f$ T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless Moned offi Sewer Water Engineering Backflow (Testable Only) Water Service