3000 E MIRALOMA AVEPermit Types
BLD ELE MEC PLM
X
Permit Number: OLD2023-02763
Issued: 06/05/2023
www.anaheim.net/building
(714)7654626
Quarter Section: 131
Nkfile] S_1i1_1a14111]
Site Address: 3000 E MIRALOMA AVE, ANAHEIM, CA 92806
Legal Description: P BK 124 PG 23 PAR 8
APN:34434204
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765.5153
Project Description: Reroof: To remove existing and install (75) sq. of over fiat roof TPO over the entire building
Living Area: Number of Stories: 1 Valuation: 44,000.00
Garage Area: Constriction Types: NIA
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinldered:
Cool Roof: Total Fess paid for Permit: 462.32
People Associated with Project:
Contractor BUILT - RITE CONSTRUCTION INC 10301 SO SAN PEDRO STREETABCDE11121291 LOS ANGELES, CA 90003
Permit Applicant Kevin Atkiuson
Owner PEIFFER, TERRY T TR 4402 PROSPECT AVE
Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
P�pNElm Cq<
Cityof Anaheim D� io
Building Division F z
U a
�DUNDED �
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 766-4280
Engineering Final (714) 765-5126
INSPECTION DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
signed:
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INS PECTI NS
AI in In actions /
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane ReinC)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
—
Do not cover or conceal the work below until the following applicable items he
beensinned:
- V
1st Floor Shear
CT
Firesprinkler (Rough) (Fire Dept.)
Mechanical Ins tions Ql r,l S� V s hkf� 2'
OO
2nd Floor Shear
(Sheathin ph rag m/Frame)
sonry(Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbinq Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service