Loading...
7906 E MONTE CARLO AVEPermit Types BLD ELE MECPLM X Permit Number: BLD2022-04762 Issued: 10/06/2022 www.anahelm.net/building (714)765-0626 Quarter Section: 215 CITY OF ANAHEIM ' BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765.5153 Site Address 17.906iEIMONTEICA_ RLO.�AVE;,ANAHEIM, :CA 92808: Leg009scriptIon NTR 12697 BLK LOT 11 UN 200 TRACT 12697, LOT 110 APN:93044700 Project Description: Mechanical: Change out air conditioner,(1) coil, and furnace Living Area: Number of Stories: 2 . Valuation: 0.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinldered: Cool Roof: Total Fees paid for Permit: 217.00 People Associated with Project: Permit Applicant Emalee Joseph Owner MIKUS STEVEN A ' 7906 E MONTE CARLO AVE Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Compressor/Boiler - up to 15 hp 1 Heating Appliances, including vent 1 Heating/Cooling Coil 1 The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. City of Anaheim Building Division Do not occupy this building until the final inspections have been made. INSPECTION I DATE I INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been Mane& Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girdem) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been s*aned7 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service FINAL INSPECTIONS I DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final PlyMbing Final Mech ma a Cross onnectli Contr (714) 765-4280 Engineering Final(714)765-5126 Fire Sprinkler (ONLY) (714) 765-5041 Fire Dept. Final (714) 765-5041 Water Engineering (714) 765-4591 Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) COA/Migation Measures Building Final (714 765-5153) Last Inspection -Final Only After Above Completed PARTIAL INSPECTIONS Buildinq Inspections Mechanical Inspections Plumbinq Inspections Electrical Inspections