211 E NORTH STProject Description: (ADU) Residential Addition: Construct 484 s.f. accessory dwelling unit detached 1 -bedroom studio with
kitchen, bathroom and living room.
Living Area: 484
Valuation: $50,00 .00
Construcion Types: VB, ,
Occupancy Groups: R3, , , ,
Fire Sprinklered? No
Cool Roof No
Total Fees paid for Permit: 3,458.86
People Associated with Project:
Owner EUGENIO SOLORIO
211 E NORTH ST ANAHEIM CA 92805-1920
Engineer FERNANDO MEJIA
8305 DUCOR AVE WEST HILLS CA 91304
Permit Applicant JUAN SOLORIO
211 E NORTH ST ANAHEIM CA
Type Electrical Fixtures
Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
New or total rewire -1 or 2 family
484 Bath Tub
1 Compressor/Boiler - up to 15 hp 1
Meter/Disc Sw - under 600 V, up to 200
1 Lavatory
1 Heating/Cooling Coil 1
amps
Water Closet
1 Ventilation Fan - <= 300 cfm on single duct 2
Kitchen Sink
1
Garbage Disposal
1
Repair/Drainage Alteration/Vent
Piping 1
Water Heater
1
't Gas System (1-5 outlets)
1
Sewer per 100 ft.
1
The permit shall expire by limitation and
become'null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work,
fbld_permit combo
Cq<
City of Anaheim P�PVAEIM i
o� o
Building Division h i
U >
�CGNUE0 8y1
Do not occupy this buildina until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
. All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed7
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildina Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
r
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
U'
Do not cover or conceal the work below until the following applicable items have
been s'
R.
1st Floor Shear d i9 tf2k.,
Firesprinkler (Rough) (Fire Dept.)
Mechanical In a Cti T EXP IRED
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
UV M
Rough Duct (Mechanical)
Rough Mechanical
DAT 2 2
Rough Electrical /q G
Rough COA/Mitagation Measures
Plumbina Inspections
Framing (Only after Plbg.. Ele., Mec. & Fire)
-H
Insulation (Sound/Energy) S 3 / J G
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg) OA
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Strutt., Ele., or Mec.)
Grease Interceptor
f Do not backfill unless sinnpd nfn
Sewer
Water Engineering Backflow (Testable Only)
Water Service
Permit Types
BLD ELE MEC PLM A.
X X X X
Permit Number: BLD2018-01892
Issued: 10/25/2018
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 82
Site Address: 211 E NORTH ST B
Legal. Description: N TR 304 BLK 2 LOT 9
CI
200 VANAHEI BLVD.
(714) 765 - 5153
EIM
Project Description: (ADU) Residential Addition: Construct 484 s.f. accessory dwelling unit detached 1 -bedroom studio with
kitchen, bathroom and living room.
Living Area: 484 Dwelling Units: 1 Valuation: $50,000.00
Construcion Types: VB, ,
Occupancy Groups: R3, , , ,
Fire Sprinklered? No
Cool Roof No
Total Fees paid for Permit: 5,635.86
Associated
Owner EUGENIO SOLO_RIO i f� �- 211 E NORTH ST ANAHEIM CA 92805-1920
Engineer FERNANDO MEJIA4 ... n I 8305 DUCOR AVE WEST HILLS CA 91304
Permit Applicant JUAN'SOLORIO, f� 211 E NORTH ST ANAHEIM CA
Type Electrical Fixtures I I t' I '"� ,-Qty Type's; Plumbing Fixtures Qty
New or total rewire -1 or 2 family 484 Bath Tub 1
Meter/Disc Sw -under 600 V, up to 200 _. -. .--._2 `~Lavatory 1
amps Water Closet 1
Sub Panel/Temp Pwr - < 600 V, 0 < amps 1 Kitchen Sink 1
<= 200 ::.... --_... .
Garbage Disposal 1
Repair/Drainage Alteration/Vent Piping 1
Water Heater 1
Gas System (1-5 outlets) 1
Sewer per 100 ft. 1
Type Mechanical Fixtures Qty
Compressor/Boiler - up to 15 hp 1
Heating/Cooling Coil 1
Ventilation Fan - <= 300 dm on single duct 2
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbidjermit_combo
�PHEIM cq r
Cityof Anaheim D� P <�O
Building Division F i
U >
�D�nrDED %
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
.?..All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 7655194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sffianed7
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
pR
®��j-Ii1��IN����R E D
Buildinq Inspe l sg `��YY
I N S P E C T I O N
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
DATE:
Do not cover or conceal the work below until the following applicable items have
been smaned7
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fine)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Strutt., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service