Loading...
1310 W NORTH STPermit Number: BLD2022-04906 Issued: 10/17/2022 www.anaheim.nettbuilding (714)765.4626 Quarter Section: 52 Site Address:, M W NORTH ST; ANAHEIM, CA 92801 Legal,Descrlptlon"•• P;BK'100 PG 28 PAR 1 "APN:03405349'' �nl�re CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765.5158 Project Description: Residential Photovoltaic System with Inverters Living Area: Number of Stories: Valuation: 10,000.00 Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Vermis: 167.00 People Associated with Project: Permit Applicant Jacob Wickman Type Mactrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures, Qty Inverter 1 The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 865 days from the date of permit Issuance. A new permit is required to commence or continue work. City of Anaheim Building Division Do not occupy this building until the final insoections have been made. INSPECTION I DATE I INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been sioned7 Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been Mane& 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service PARTIAL INSPECTIONS Building Inspections Mechanical Inspections Plumbing Inspections Electrical Inspections 1 . FINAL INSPECTIONS I DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4260 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 Fire Dept. Final (714) 765-5041 Water Engineering (714) 765-4591 Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) COA/Migation Measures Building Final (714 765-5153) Last Inspection -Final Only After Above Completed f, j r' PARTIAL INSPECTIONS Building Inspections Mechanical Inspections Plumbing Inspections Electrical Inspections