915 E ORANGEWOOD AVE (7)City of Anaheim
BUILDING DIVISION
INSPECTION RECORD
i
SWIMMING POOL
ADDRESS:
915 E ORANGEWOOD AVE, ANAHEIM, CA 92802
OWNER:
3. Steel 508
PERMIT#:
SWI2020-00097
DATE ISSUED:
04/16/2021
DESCRIPTION:
New Pool: 711 sq ft new in -ground gunite pool with
DO NOT GUNITE ROCK STRUCTURE
(water feature, rock slide, fountain, waterfall, grotto etc.) until the above inspection has
been stoned.
ADA lift.
POST THIS CARD WITH THE APPROVED PLANS
IN A CONSPICUOUS PLACE ON THE JOB SITE
Inspection Code Qate Inspector
1. Mein Drain 504 �G
2. Electric Bonding 506
3. Steel 508
4. Approval to Gunite 510
DO NOT GUNITE POOUSPA
unfit all the above inspections have been signed.
5. BLD -Steel and Electric bonding
(Rock Structures,Slides Etc)
508
DO NOT GUNITE ROCK STRUCTURE
(water feature, rock slide, fountain, waterfall, grotto etc.) until the above inspection has
been stoned.
6. Underground Electric
512
912 611
j {•-
7. Gas Piping Test
514
11 8,^ •�
8. P -Trap Receptor
516
i . Jt. ., _•�
9. Backnow
518
^-
10. Deck, Deck Drains,
Equipotential & Accessory
Bonding
520
-7
_
SSC-,'
DO NOT POUR FLATWORK
until all the above Inspections have been signed.
11. Rough Electrical 522
12. Fencing/Door Alarms 524
13. Plaster approval 526
DO NOT PLASTER
until all the above inspections have en signed.
14. Final Electric 528
Sub -Contractors List MUST be approved and pool cover on site
PRIOR to Pool Final Inspection request
FINAL INSPECTION CODE DATE INSPECTOR
15. Rough Demo 527
16. Final 599
MISC. INSPECTIONS Date Inspector
fbldjobcards
Inspections 1d:
1. All plumbing to be completed and the system pressurized to 35 lbs. with water
or house pressure.
2. All metal within 5 feet of pool water, and all pod equipment, must be bonnded
to pod reinforcing steel with #8 solid copper wire. Niche light shell, deck inserts,
etc. shall be bonded to pod rebar.
3. Pool equipment is not required to be set at this time.
Inspections 0.10:
1. Underground elecMc Inspected prior to backfilling.
2. Gas line test at 100 for 15 minutes with 159 gauge.
3. When polyethylene gas piping is used, a certificate from a certified Installer
and tracer wire shall be provided per CPC 1210.1.7.2 APPENDIX I.
inspections 11.13:
1. Rough electric Inspection when all wiring is completed and ready prior to the
plastering of poollspa. Potting compound in place at plesfight niche.
2. Current Code requires that any pod, spa or water fea e
contacting water 16 inches or more in depth shall be enclosed by a barrier
adequate to prevent entry of small children. The barrier shall comply with
Section 3109 of current CBC and CRC APPOENDIX V specifying the height of
any fence provided as barrier to the pool 8- shall be 60- above grade on the
outside of the fence.
3. Doom from a garage shall meet the requirements for a gate. Glass
windows within S of pool water shall be tempered glass.
4. Prior to pre -plaster inspection, streets, curbs and city sidewalks will be
inspected for any damage due to construction of pool or spas.
S. Grading complete with positive drainage to street or public way. All
exposed plastic pipe shall be painted to protect from sunlight.
Inspections 14.16:
1. Gas and EleWlcal completely removed and 2x2 holes at bottom of pool
end/or Isolated elements.
2. Pool backfilled:
A.) With future build - se0eompacting sand 95% with receipt.
B.) No future build - any fill.
3. After pod Is operating and In working condition with approved pod cover on
elle.
Inspection requests made prior to 5:00 pm Monday - Friday
will be scheduled on the following workday.
To schedule your building inspection online, please go to
https://aca.anaheim.neVC!tizenAccess
Inspection can normally be reached between
7:30 - 8:00 A.M.
(714)765.5153 + 0
To access your inspection timeframe:
Please go to www.anahelm.net/buiiding after 7:30am on the day of your
Inspection. Under Online Services, dick on the link -Inspection
Timetramee or call (714) 765.5153 + 0