1226 N OLIVE ST (16)Permit Types
BLD D I ELE MECPLM
X
9
Permit Number: BLD2015-02146
Issued: 06/10/2015
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 81
Site Address: 1226 N OLIVE ST
Legal Description: SEC 3 T 4 R 10 POR E1/2
C
200 VNIANAHEIM4LVD.
(714) 765 - 5153
Project Description: Tenant Improvement: Install ammonia refrigeration system for can line expansion.
People Associated with Project:
r_*
EIM
Number of Stories 1 Valuation: $1,654,904.00
Construcion Types: N/A, ,
Fire Sprinklered? No
Cool Roof No
Total Fees paid for Permit: 2,597.62
Owner NOR -CAL BEVERAGE CO 2286 STONE BLVD WEST SACRAMENTO CA 95691-4050
Engineer JON KWOK
Contractor C & L REFRIGERATION CORP 479 NIBUS ST BREA CA 926210000
Permit Applicant JON KWOK
Type
Electrical Fixtures
Qty Type Plumbing Fixtures Qty Type
Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit combo
P�PHEIM Cq<
City of Anaheim D� o
Building Division F i
u >
�DVNDED �$y^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final 09A., D, 4.a
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
si ned:
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
; J
pawll
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Ins ecHons,erJ1/�, % . n
! Pir —5 %�`- ISM/ (/
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
(o1/'
Underfloor Insulation (Raised Foundation Only)
(�
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been s' ned:
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Pibg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construct!
Exterior Plaster (Brown Coat)
T-Bar (Strutt., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless smaned ofn
Sewer
Water Engineering Backflow (Testable Only)
Water Service