Loading...
1226 N OLIVE ST (16)Permit Types BLD D I ELE MECPLM X 9 Permit Number: BLD2015-02146 Issued: 06/10/2015 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 81 Site Address: 1226 N OLIVE ST Legal Description: SEC 3 T 4 R 10 POR E1/2 C 200 VNIANAHEIM4LVD. (714) 765 - 5153 Project Description: Tenant Improvement: Install ammonia refrigeration system for can line expansion. People Associated with Project: r_* EIM Number of Stories 1 Valuation: $1,654,904.00 Construcion Types: N/A, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 2,597.62 Owner NOR -CAL BEVERAGE CO 2286 STONE BLVD WEST SACRAMENTO CA 95691-4050 Engineer JON KWOK Contractor C & L REFRIGERATION CORP 479 NIBUS ST BREA CA 926210000 Permit Applicant JON KWOK Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit combo P�PHEIM Cq< City of Anaheim D� o Building Division F i u > �DVNDED �$y^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final 09A., D, 4.a Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been si ned: Building Final (714 765-5153) Last Inspection-Final Only After Above Completed ; J pawll Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Ins ecHons,erJ1/�, % . n ! Pir —5 %�`- ISM/ (/ Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) (o1/' Underfloor Insulation (Raised Foundation Only) (� Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been s' ned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Pibg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construct! Exterior Plaster (Brown Coat) T-Bar (Strutt., Ele., or Mec.) Grease Interceptor (Do not backfill unless smaned ofn Sewer Water Engineering Backflow (Testable Only) Water Service