926 S PARK CIR 1-8Permit Types
BLD ELE MEC FLM
X
Permit Number. OLD2023-02660
Issued: 05/31/2023
www.anaheim.net/building
(714)7654626
Quarter Section: 48
She Address: 926 S PARK CIR 1-8, Anaheim, CA 92804
Legal Doscdptlon: +N TR 3266 BLK'LOT 29
APN: 12829116
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 -5153
Project Description: Reroof: To remove and install (1550) sq. of torch down over flat roof of carports of apartment building
LMng Area: Number of Stories: 1 Valuation: 11,000.00
Garage Area: Construction Types: NIA
Carport Ares: Occupancy Groups:
Balcony I Deck Area: Fire SprinNered:
Cool Roof: Total Fees paid for Perron: 342.08
People Associated with Project:
Contractor MCCARTHY ROOFING 625 WEST KATELLA AVE 029201905140819378210 ORANGE, CA 92867
Permit Applicant Cesar Ferman
Owner COEG-CA LLC 1301 ARROYO LINDO DR
Type Electrical Fixtures My Type Plumbing Fixtures Oty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
P�PHEIM Cq<
City of Anaheim of �o
Building Division i
u >
DED day^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/MiggW Measures
Do not install subiloor or pour floor slab until the follwing applicable items have been
sinned:
ilding Final 714 765-5153) FPO
Ins ect anal Only After Above Competed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
5
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned*
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd r
oof Sheathing) iaphragm/Frame) Z—
elnf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbinq Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Strutt., Ele., or Mec.)
Grease Interceptor
(nn not hackfill ijnlpqq
Sewer
Water Engineering Backflow (Testable Only)
Water Service