7330 E PASEO LAREDOCITY OF ANAHEIM
Permit Number: BLD202340298i*•
Issued: 02/06/2023
www.anaheim.net/building
(714)765-4626
Quarter Section: 196
Sits Address: 7330 E PASEO LAREDOANAHEIM, CA 92808
Legal Dest:riptlon: N TR 7734 BLK LOT 24
APN:35823225
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 785.5153
Project Description: Residential Photovoltaic System with Microinverters
�JE
Uving Area: Number of Stories: Valuation: 35,308.00
Garage Area: Construction Types.
Carport Area: Occupancy Groups:
Balcony i Dock Area: Fire Sprinldered:
Cool Roof: Total Fees paid for Permit: 293.00
People Associated with Project:
Contractor HAHA SMART INC 2290 AGATE CT UNIT A SIMI VALLEY, CA
Permit Applicant Jesus Gannendia
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Microinverter 24
Sub Panel/Temp Pwr - Under 600 V, up to 1
200 amps
a
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
n
P�Pr1E114 Cq<
Cityof Anaheim D� io
Building Division
u >
�DGNDED day^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE INSPtCTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final lZ
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianedt
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
10
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been smanedi
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbinq Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service