Loading...
8355 E QUIET CANYON CTPermit Types BLD ELE MEC* X X Permit Number: BLD2023-01387 Issued: 06/20/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 227 CITY OF ANAHEIM Site Address::8355 E QUIET CANYON CT, ANAHEIM, CA 92808 Le8albe-i6f1pti6n: N.TR 14190 BL'K LOT 4 "APN: 35447212 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765-5153 Project Description: Photovoltaic System: Install residential roof mounted solar system (26) modules and (26) micro -Inverters. Living Area: Number of Stories: 1 Valuation: 26,000.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 704.00 People Associated with Project: Contractor SAM'S PHOTOVOLTAIC 11 LA SIERRA DRIVE201709131146525808 POMONA, CA 92544 Permit Applicant Anil Desai Owner PATEL TORAL 8355 E QUIET CANYON CT Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Microinverter 26 The permit shall expire by limitation and become null and void it the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. P�PNEIM Cqf Cityof Anaheim o� io Building Division F z a ON D�NDED Do not occupy this buildinq until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianedd Building Final (714 765-5153) Last Inspection-Final Only After Above Completed /./3dli Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane ReinL) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been Mane& 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor !Do nnt harkfill unless Maned off) Sewer Water Engineering Backflow (Testable Only) Water Service