8395 E QUIET CANYON CTr
Permit Types
CITY OF ANAHEIM
BLD • ELE MEC PLM
V X
BUILDING DMSION
Permit Number: OLD2023-02718
200 S. ANAHEIM BLVD.
Issued: 06/02/2023
(714) 765 - 5153
www.anaheim.net/building
(714)765-4626
Quarter Section: 227
Site Address: 8395 E QUIET CANYON CT, ANAHEIM, CA 92808
Legai'Description: N TR 14190 BLK LOT 14
_APN: 35447202
- -
Project Descrlption: Residential EV Charger in garage
Living Area: Number of Stories:
1
Valuation: 0.00
Garage Area:
Construction Types: NIA
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinidered:
Cool Roof:
Total Fess paid for Permit: 167.00
People Associated with Project:
Permit Applicant Masie Lee
Owner LEE, DANIEL SEELUM TR GOD
8395 E QUIET CANYON CT
Type Electrical Fixtures Oty Type
Plumbing Fixtures
Qly Mechanical Fixtures Qty
EV Charger 1
r
P�PNEIM �.q<
Cityof Anaheim
Building Division y
u >
�DGNDED $y�
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final 617123 T64-A
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianedi
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girdem)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been swanede
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (ReinE/Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service