Loading...
123 N RIO VISTA ST (8)Permit Types " 9LD ELE MEC PLM X X Permit Number: BLD2023-01393 Issued: 03/27/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 122 Site Address: 123 N RIO VISTA ST, Anaheim, CA 92806 :l egal eaAA on: P BK 392 PG 49 PAR 1 APN:26828342 01OLDi e Pul CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765.5153 Project Description: Residential Photovoltaic System with Microinverters -1y Living Area: Number of Stories: Valuation: 10,000.00 Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinldered: Cool Roof: Total Fees paid for Pernik: 167.00 People Associated with Project: Contractor PACIFIC COAST GENERATION INC 30135 LITTLE HARBOR DRIVE CANYON LAKE, CA Permit Applicant Joshua Vasquez 30135 Little Harbor Dr Canyon Lake, CA 925879258 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Microinverter 25 The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. City of Anaheim Building Division Do not occupy this building until the final inspections have been made. INSPECTION I DATE INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been sinned: Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girdem) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Constructio Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service FINAL INSPECTIONS I DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 41(9(t3 Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 Fire Dept. Final (714) 765-5041 Water Engineering (714) 765-4591 Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) COA/Migation Measures Building Final (714 765-5153) y�lu' Last Inspection -Final Only After Above Completed i3✓' PARTIAL INSPECTIONS Building Inspections Mechanical Inspections Plumbing Inspections Electrical Inspections Permit Types BLD ELE MEC PLM X I X Permit Number. BLD2023-01393 Issued: 03/27/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 122 Site Address: 123 N RIO VISTA ST, Anaheim, CA 92806 Legal Description: P BK 392 PG 49 PAR 1 APN:26828342 r��t. IA� ,Pv 3�Z�-i 202 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141 765 - 5153 WORKER'S COMPENSATION DECLARATION: WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OR THE LABOR CODE. INTEREST, AND ATTORNEYS FEES. I hereby affirm under penalty of perjury one of the following declarations: I have and will maintain a certificate of consent to selfansure for worker's compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. JV I have and will maintain worker's compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers Compensation insurance carrier and policy are: Cartier: Policy No.: Expiration Date: Name of Agent: Phone No.: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers compensation laws of California, and agree that, if I should become subject to the workers compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions. Joshua Vasquez 3/27/2023 Signature of Applicant Date -t DECLARATION REGARDING CONSTRUCTION LENDING AGENCY: I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Sec.3097.Civ.C): Lender's Name: Lender's Address: LICENSED CONTRACTOR'S DECLARATION: 1 hereby affirm under the penalty of Perjury that I am licensed under provisions of chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is In full force and effect. PACIFIC COAST GENERATION INC 3/27/2023 Contractor Signature f' -Date NUMBER EXPIRATION DATE LICENSE TYPE IS 1074469 04/30/2023 C70