937 S ROBERTS ST (4)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2022-05807
Issued: 12108/2022
www.anaheim.neUbuilding
(714)765-4626
Quarter Section: 55
CITY OF ANAHEIM
Site Address: 937 S ROBERTS ST 1-8, ANAHEIM, CA 92802
Legal be N TR 2534 BLK LOT 4
s_.
APN:25015108
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765-5153
Project Description: Plumbing to replace drainage and repipe with copper for Units (1-8)
Living Area: Number of Stories: 2 Valuation: 0.00
Garage Area: Construction Types: NIA
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Sprinklered:
Cool Roof: Total Fees paid for Permit: 167.00
People Associated with Project:
Owner GARCIA GEORGE H TR THE 937 ROBERTS ST
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Repair/Drainage AlterationlVent Piping 1
Water Distribution 1
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
P�Pt1EIM CqC
Cityof Anaheim o� io
Building Division F i
u >
DED 1$y�
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
bing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
s' e •
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been si ned:
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Mason Beam/Pre-Grout) A.
ough Plumbing (Top Out —
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service