Loading...
937 S ROBERTS ST (4)Permit Types BLD ELE MEC PLM X Permit Number: BLD2022-05807 Issued: 12108/2022 www.anaheim.neUbuilding (714)765-4626 Quarter Section: 55 CITY OF ANAHEIM Site Address: 937 S ROBERTS ST 1-8, ANAHEIM, CA 92802 Legal be N TR 2534 BLK LOT 4 s_. APN:25015108 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765-5153 Project Description: Plumbing to replace drainage and repipe with copper for Units (1-8) Living Area: Number of Stories: 2 Valuation: 0.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 167.00 People Associated with Project: Owner GARCIA GEORGE H TR THE 937 ROBERTS ST Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Repair/Drainage AlterationlVent Piping 1 Water Distribution 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�Pt1EIM CqC Cityof Anaheim o� io Building Division F i u > DED 1$y� Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final bing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been s' e • Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been si ned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Mason Beam/Pre-Grout) A. ough Plumbing (Top Out — Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service