1247 S RAMBLEWOOD DRPermit Types
BLD ELE MEC*
EC PLM
X
Permit Number: BLD2022-04978
Issued: 10/19/2022
www.anaheim.net/building
(714)765-4626
Quarter Section: 7
CITY OF ANAHEIM
Site Address: 1247 S RAMBLEWOOD DR, ANAHEIM, CA 92804
:Legal"Description: NTR 2833 BLK LOT 8
i4PN: 07949322
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765.5153
Project Description: Mechanical to change out air conditioner, (1) Furnace, (9) registers and (1) coil.
Living Area: Number of Stories: 1 Valuation: 0.00
Garage Area: Construction Types: NIA
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Spdnldered:
Cool Roof: Total Fees paid for Permit: 437.00
People Associated with Project:
Owner JENIC BRANISLAV TR JENIC 1247 S RAMBLEWOOD DR
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Evaporative or Air Cooled Condenser 1
Heating Appliances, including vent 1
Heating/Cooling Coil 1
Residential Registers 9
t
The permit shall expire by limitation and become null and vold if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
City of Anaheim
Building Division
I FINAL INSPECTIONS I DATE I INSPECTOR I
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbina Final
EN
(Cross Connection Contror(714) 765-4280 ' --j - I / 1/1
Do not occupy this building until the final inspections have been made. I Engineering Final (714) 765-5126
INSPECTION I DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste) •
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been swane&
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service