1425 S RUSTIC LN (5)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2023-02715
Issued: 06/02/2023
www.anaheim.net/building
(714)765-4626
Quarter Section: 29
Site Address: 1425 S RUSTIC LN, ANAHEIM, CA 92804
Legal Description: N TR 2653 BLK LOT 129
APN:12745122
CITY OF ANAHEIM
BUILDING DMSION
200 S. ANAHEIM BLVD.
(7141 765 -5153
Project Description: Photovoltaic system: remove and reinstall permitted solar system. (REF#: BLD2014-05623).
Living Area: Number of Stories: 1 Valuation: 51000.00
Garage Area: Construction Types. NIA
Carport Area: Occupancy Groups:
Balcony I Dedr Area: Fire Sprinldered:
Cool Roof. Total Fees paid for Permit: 171.65
People Associated with Project:
Contractor SUNPOWER ENERGY SYSTEMS 1114 KOE STREET SAN DIEGO, CA
Permit Applicant Rigo Torres
Owner NGUYEN. KADEN DUY 1425 S RUSTIC LN
Type Electrical Flxtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work. .
P�PNEIM C9<
City of Anaheim o� io
Building Division F z
u >
��G�►DED 6y^
Do not occupy this buildinq until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 765-5126
INSPECTION I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sione .
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been slanedn
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Strutt., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service