Loading...
1425 S RUSTIC LN (5)Permit Types BLD ELE MEC PLM X Permit Number: BLD2023-02715 Issued: 06/02/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 29 Site Address: 1425 S RUSTIC LN, ANAHEIM, CA 92804 Legal Description: N TR 2653 BLK LOT 129 APN:12745122 CITY OF ANAHEIM BUILDING DMSION 200 S. ANAHEIM BLVD. (7141 765 -5153 Project Description: Photovoltaic system: remove and reinstall permitted solar system. (REF#: BLD2014-05623). Living Area: Number of Stories: 1 Valuation: 51000.00 Garage Area: Construction Types. NIA Carport Area: Occupancy Groups: Balcony I Dedr Area: Fire Sprinldered: Cool Roof. Total Fees paid for Permit: 171.65 People Associated with Project: Contractor SUNPOWER ENERGY SYSTEMS 1114 KOE STREET SAN DIEGO, CA Permit Applicant Rigo Torres Owner NGUYEN. KADEN DUY 1425 S RUSTIC LN Type Electrical Flxtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. . P�PNEIM C9< City of Anaheim o� io Building Division F z u > ��G�►DED 6y^ Do not occupy this buildinq until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sione . Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been slanedn 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Strutt., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service