2731-2737 E REGAL PARK DR (2)Permit Types
BLD ELE MEC PLM
X X X X
Permit Number: BLD2018-03292
Issued: 09114/2018
www.anaheim.neUbuilding
(714)765-4626
Quarter Section: 121
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714)765 -5153
Site Address: 2731-2737 E REGAL PARK DR, ANAHEIM, CA 92806
Legal Dsarlption: P BK 113 PG 41 PAR 2
APN:34439411
Project Description: Tenant Improvement: Removal of unpermitted work to include closing of opening in wall between addresses 2731
and 2737, removal of (2) powder booths, (2) batch ovens, and compressor with repairs done to openings created for unpermitted
equipment. Work done prior to obtaining permit REF INV2018-00325.
Living Area: Number of Stories: 0 Valuation: 10,000.00
Garap Area: Construction Types: IIIA
Carpue Area: Occupancy Groups:
Balcony/ Deck Area: Fire Sprinidered: No
Cool Roof: Total Fees paid for Permit: 2,854.24
People Associated with Project:
Permit Applicant PEDRO VALDEZ 2731 E REGAL PARK DR ANAHEIM, CA 92806
Owner RICHARD HUNSAKER TR P 0 BOX 2423 SANTA ANA, CA 92707
Engineer - Civil EARL W WEBB 1299 COLUMBIA AVE. STE E-7 200204301356595140 RIVERSIDE, CA 92507
Type Electrical Fixtures Qty Type Plumbing Fixtures Oty Mechanical Fixtures City
Motors - over 1 h.p. to 10 h.p. 1 Gas System (1.5 outlets) 1 CompressodBoiler - over 15 hp 1
Motors - over 10 h.p. 1
Receptacle, switches, lights
\ '?�,\AD
\ Q''kp '�(ACq
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
P�PNEIM cqC
City of Anaheim OF �o
Building Division F z
u >
SOUNDED
Do not occupy this building until the final inspections have been'made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final jo
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
smaneds
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sonned7
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbinq Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless slaned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service