Loading...
2878 W ROME AVE (3)Permit Types BLD ELE MEFr PLM _ • X X PermIll Number. BLD202245542 Issued: 11/28/2022 www.anaheim.net/building (714)765.4626 Quarter Section: 14 Slte.Address: 2878 W ROME AVE, Anaheim, CA 92804 Lipal Descriptions N TR'2228 BLK LOT.122 APNs'12624402 CITY OF ANAHEIM Project Description: Residential Photovoltaic System with Inverters BUILDING DMSION 200 S. ANAHEIM BLVD. (714) 765.5153 FV `&V� OKuK Living Area: Number of Stories: Valuation: 17,750.00 Garage Area: Constriction Types: Carport Area: Occupancy Groups: Balcony / Dock Area: Fire Sprinldered: Cool Roof: Total Fees paid for Permit: 293.00 People Associated with Project: Permit Applicant Juan Contreras 970 W 190th St TORRANCE. CA 90502 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qly Sub Panel/Temp Pwr - Under 600 V, up to 1 200 amps The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or confinue work. P�PF1EI14 �q< Cityof Anaheim D� io Building Division F z u a �0 DED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned: Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised. Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless smaned nffi Sewer Water Engineering Backflow (Testable Only) Water Service