2878 W ROME AVE (3)Permit Types
BLD
ELE MEFr PLM _
• X
X
PermIll Number. BLD202245542
Issued: 11/28/2022
www.anaheim.net/building
(714)765.4626
Quarter Section: 14
Slte.Address: 2878 W ROME AVE, Anaheim, CA 92804
Lipal Descriptions N TR'2228 BLK LOT.122
APNs'12624402
CITY OF ANAHEIM
Project Description: Residential Photovoltaic System with Inverters
BUILDING DMSION
200 S. ANAHEIM BLVD.
(714) 765.5153
FV `&V� OKuK
Living Area: Number of Stories: Valuation: 17,750.00
Garage Area: Constriction Types:
Carport Area: Occupancy Groups:
Balcony / Dock Area: Fire Sprinldered:
Cool Roof: Total Fees paid for Permit: 293.00
People Associated with Project:
Permit Applicant Juan Contreras 970 W 190th St TORRANCE. CA 90502
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qly
Sub Panel/Temp Pwr - Under 600 V, up to 1
200 amps
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or confinue work.
P�PF1EI14 �q<
Cityof Anaheim D� io
Building Division F z
u a
�0 DED
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned:
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised. Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned:
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbinq Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless smaned nffi
Sewer
Water Engineering Backflow (Testable Only)
Water Service