3252 W RAVENSWOOD DR (7)Permit Types
BLD ELE MEC PLM
X X I X X
Permit Number: BLD2018-04695
Issued: 10/17/2018
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 7
Site Address: 3252 W RAVENSWOOD DR
Legal iDescription: N TR 2833 LOT 58
C
200 SMANAHEIWBL
(714) 765 - 5153
EIM
Project Description: Residential Remodel: (2) bathroom remodels with mechanical, electrical and plumbing fixtures.
Valuation: $6,000.00
Construcion Types: N/A, ,
Total Fees paid for Permit: 668.78
People Associated with Project:
Owner RANDOLPH LEE CUMMINGS TR 3252 RAVENSWOOD DR ANAHEIM CA 92804-4754
Contractor BACCARO CONSTRUCTION CO INC 4020 N PALM ST #201 FULLERTON CA 928350000
Permit Applicant PETER BACCARO
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
Receptacle, switches, lights 6 Bath Tub 1 Ventilation Fan - — 300 cfm on single duct 2
Shower 1
Lavatory 2
Water Closet 2
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit combo
P�, EIM CqC
Cityof Anahei m D� �o
Building Division y
U '
�OVNDED �$y^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/FormsITrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
signed:
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed (
z3�/Y°
Odo
Plumbing (Ground/UnderfloorWater)
Underfloor Rough Gas
LG-�
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been smanadi
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough ElectricalZ /g
Rough COAIMitagation Measures
Plumbina Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been sired:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
1` B
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service
5