Project Description: Mechanical and Plumbing to Replace air conditioner, (1) coil, (1) furnace, and water heater in garage.
Living Area: Number of Stories: 0 Valuation: 0.00
Garage Area: Construction Types: NIA
Carpue Area: Occupancy Groups:
Balcony / Deck Area: Fire Sprinldered:
Cool Roof: Total Fees paid for Permit: 286.00
People Associated with Project:
Permit Applicant ben medina
Owner HURSMAN ROY A TR 135 N SWEETWATER ST
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Water Heater 1 Evaporative or Air Cooled Condenser 1
Heating Appliances, Including vent 1
Heating/Cooling Coil 1
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
City of Anaheim
Building Division
I FINAL INSPECTIONS I TFA7ERTF INSPECTOR I
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final -4 tAMA
tubing Final
Mechanical Final
Cross Connection on of (714) 65.4 80
Do not occupy this building until the final inspections have been made. I Engineering Final (714) 765-5126
INSPECTION I DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
signed:
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned:
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Constructoon
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service
g22- o�M2�, �� rs weetwncea a.ib�
CITY OF ANAHEIM
LOT PLAN
PLANNING SERVICES DIVISION
APPROVED (3S P, 4,
DATE � 5 - ZONE42S. Z
BY
DEV
FEE $ OX
EF
ICIENCY
WATER
Exempt O
ew >501 Oft' 0 Alter >2,500 ft'
Plans compry wi
h Ufa 18 of the A.. (Zoning).
This does not
stitute approval of uilding
permit or author,
Wolation of any Codes.
W+^41
r.
em 1 K ex -
t2es�o2a•Le�
C�
;ECEI I ED
CITY OF ANAHEIM
18 BUILDING
1�
OWNER: ,D"&jtA'.,.
JOB ADDRESS: l� �i • Q,�
SCOPE OF WORK