Loading...
296 N SPRUCE DR (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2023-01121 Issued: 03/08/2023 www.anaheim.net/building (714)765-0626 Quarter Section: 102 'Site Addiess: 296 N SPRUCE DR, ANAHEIM, CA 92805 Legal Descriptlori: N TR 1429 BLK LOT 90 APN:03527211 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. 1714) 765 - 5153 Project Description: Plumbing: to change out water heater located in exterior closet. Living Area: Number of Stories: 1 Valuation: 0.00 Garage Area: Construction Types: NIA Carport Area: Oocupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 167.00 People Associated with Project: Contractor GREENCAT INC 26501 RIO VISTA DR HEMET, CA Permit Applicant Ivet Gonzalez Owner PINEDA ANDRES JAIME 296 N SPRUCE DR Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures City Water Heater 1 The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�PNEIM C9< Cityof Anaheim D� �o Building Division F y u v �DG�►DED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final 4*23 Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings). COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been s' Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Constructio Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service