Loading...
433 N SYRACUSE ST (7)Permit Types BLD ELE MEC PLM X Permit Nl:mbm-f: SD21i231 k'4 -- Issued: 03/07/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 19 Site Address: 433 N SYRACUSE ST, Anaheim, CA 92801 2". =r Legal Description: N TR 3045 BLK LOT 42 APN:07063164 CITY OF ANAHEIM BUILDING DMSIDN 200 S. ANAHEIM BLVD. 1714) 765.5153 Project Description: Plumbing for redrain at kitchen sink and laundry room. Living Area: Number of Stories: 0 Valuation: 0.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinldered: Cool Root Total Fees paid for Permit262.00 People Associated with Project: Contractor ROOTER HERO PLUMBING 11150 SEPULVEDA BLVD STE 2A201804181246247567 MISSION HILLS, CA 92805 Permit Applicant Randy Metzeler Owner PHAN HOA 433 N SYRACUSE ST Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Repair/Drainage Alteration/Vent Piping 1 Shower 1 The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�PNEIM CqC City of Anaheim D� io Building Division % u > �DG�►DED 1$h^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Ski Mechanical Final Cross Connection Control (714) 765-4260 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been siane . Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been soaned7 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Constructoo Exterior Plaster (Brown Coat) T-Bar (Strutt., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service