Loading...
629 S SHERRILL ST (5)Permit Types BLD ELE MEC PLM .X X Permit Number: BLD2018-00929 Issued: 03/05/2018 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 21 Site Address: 629 S SHERRILL ST Legal.' Description: N `TR 2874 LOT,26 Project Description: Patio Cover: 400 sq.ft. solid cover built per city standard. CI 200 SMANAHEIMSBLVD. (714) 765 - 5153 EIM Valuation: $3,000.00 Construcion Types: N/A, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 299.64 People Associated with Project: Owner JUVENTINO GONZALEZ 629 S SHERRILL ST ANAHEIM CA 92804-3217 Contractor V SALDIVAR CONSTRUCTION 1620 ADRIENNE DR CORONA CA 917200000 Permit Applicant VINCENTE SALDIVAR Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Receptacle, switches, lights 3 The permit shall expire by limitation and become null and void if the, building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbid_permit_combo P�PNEIM CqC City of Anaheim D� �o Building Division y U > �OGNDED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Al Electrical Final j$' Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer ASub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) /1&yd COAIMigation Measures Do not install subfloor or pour floor slab until the follvWAng applicable ite have been s' ne • Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been Maned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) 0 Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical a� Rough COA/Mltagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mac & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service