Loading...
750 S STARVIEW CT (6)CITY OF ANAHEIM Permit Number. BLD2022-04995 Issued: 11/28/2022 www.anaheim.net/building (714)765-4626 Quarter Section: 226 Ske Address: 750 S STARVIEW CT, ANAHEIM, CA 92808 Legal Description: IN TR 13155 SLK LOT 30 APN 35426219 Project Description: Residential Photovoltaic System with Inverters BUILDING DMSION 200 S. ANAHEIM BLVD. (714)765-5153 CSN IPv LMng Area: Number of Stories: Valuation: 15,200.00 Garage Area: constriction Types: carport Area: Occupancy Groups: B@WW I Deck Area: Fire Sprinidered: Cool Roof: Total Fees paid for Parmh: 293.00 People Associated with Project: Permit Applicant Clinton Fallen Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Inverter 1 Motor/Disc Sw - Under 600 V, up to 200 1 amps w: The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�PNEIM �.q` City of Anaheim of io Building Division z u DED �$y^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTO All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Slaw Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianedi Building Final (714 765-5153) Last Inspection -Final Only After Above Completed 2603 04, Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned7 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service Solar PV Standard Plan — Simplified Central/String Inverter Systems for One- and Two -Family Dwellings 9. Single -Inverter Line Diagram L------- 1� ------ DC GEC, . When Required --------- T,- - - Single -Line Diagram for Microinverters or ACMs Check a box for do system grounding: ® Grounded, O Ungrounded For ungrounded do power systems, EGC Is required For grounded do power systems, GEC & EGC are required Refer to CEC 250.120 for EGC installation & Table 250.122 for sizing • Consult with your local AHJ and /or UtTly Branch Circuit OCPDs Branch 1 OCPD size 20A Branch 2 OCPD size Branch 3 OCPD size Solar Load Center Busbar(Section 5) M =W� --yt--------- I Main Service Panel OCPDs 1 Main OCPD size: (table 5) 20A Combined Inverter Output OCPD: (Table 4)13.31 Main Service Panel Busbar. (Table 5) 200A Conductor. Cable and Conduit Schedule Equipment Schedule TAG DESCRIPTION: (Provide model # if provided) 1 Solar PV Module or ACM: SEG SOLAR: SEG -400 -BMD -HV 2 Microinverter if not ACM): ENPHASE: IOSM-72-2-US 3 Junction Box (as): UL -LISTED WATER -TIGHT NEMA 311 RATED 4 Solar Load Center, Yes / No: No 5 Performance Meter Yes / No: Yes 6 1 'Utility Extemal Disconnect Switch Yes / No:Yes 7 1 Main Electrical Service Panel 200/200A L------- 1� ------ DC GEC, . When Required --------- T,- - - Single -Line Diagram for Microinverters or ACMs Check a box for do system grounding: ® Grounded, O Ungrounded For ungrounded do power systems, EGC Is required For grounded do power systems, GEC & EGC are required Refer to CEC 250.120 for EGC installation & Table 250.122 for sizing • Consult with your local AHJ and /or UtTly Branch Circuit OCPDs Branch 1 OCPD size 20A Branch 2 OCPD size Branch 3 OCPD size Solar Load Center Busbar(Section 5) M =W� --yt--------- I Main Service Panel OCPDs 1 Main OCPD size: (table 5) 20A Combined Inverter Output OCPD: (Table 4)13.31 Main Service Panel Busbar. (Table 5) 200A Conductor. Cable and Conduit Schedule TAG Description and Conductor Type: (Table 3) Conductor Number of Size Conductors Conduit/ Conductor/ Conduit Size Cable Type Current -Carrying Conductors: (for each branch circuit) A EGC: 010 O -Cable, #6 Bare CU (2)0 -Cable, (1) Bare CU #10 O -CABLE (L1, L2) Free Air Secured GEC (When required): #6 BARE CU - EGC CON r. (G) Current -Carrying Conductors:TH o wN- 3/4^ Conduit B EGC: #8 WN -2 AWG EGC (1 j#8 T WN -2 AWG EGC 0 3 0 0 iy v m 3 3 OQ G) C G. M Cr 0 0 7< SOLAR PV STANDARD PLAN - SIMPLIFIED Microinverter and ACM Systems for One- and Two -Family Dwellings ROOF LAYOUT PLAN • SER ARAOGDMAI.XTACRIRlWITA3KEMS)MR►LOTLT•WMICATIOO¢)9,'IWITC16 RBTALATIWI ALL WICI6C/TIC MM ISTRUCILR!toBE OGTUMINcoma • ALLCOROIATMOWOIDW{TRL@TLSTOROPTIC 9n=G SRALL@SLQTRIITATTAOlDTOTIC SYLOCIG • YSOSW@LOTAIIDATMLLO:TlR aITLR.R'67N!'R�67C[OTntIILTLRR5T1:lOW®SOIi.B'6TTNl5LM@RiN[L • U571116151WITT'4LWIATORS.P01 H[LWRW/G APPLIAMMWMCALAO)ACITIOTO[ RpOSCD&7OWLLS, MUST@ RST MED Ir ASOV!TY.L IIOWJLWTOP SURFACE TOCOPAMWICMC SOLS )&CAC 503.7111 UWWGaJNPWMWIG%IWTLl.'.LIATMLWMMACIACEYITWTICPROV.M. MODOIIS&Nu55@Ir LMi.PMA WrlOFMCO LB&L!!Sfl AM W ABOVE TIC r.10D1R17TOP SLTJ=T000MPLY %V1 CPC 1OLS TWO VULEMOTINSAM" BARS PER PANRW/POLTRAITOxQTAT100. ONOWM WEVAIMATl PARS WIAMMISN IAIMSCAP!OIOO.TATM COIDWATTRGP.OWW40 'MMWINVCFPOWCPCNIU DP%'.AIDW.10I UR . • PACr.YATFORGROLMNA.LI@IPCOfD)1RIOPSRaNW.@DATLCRLi@ICMnO6([)) fAW.WMUIOCAMRIWIOFa %'....UMP MWfRALTQMVECM%".TASLLSWIGSLMLC D.AOOWA3{LSPAO Qi TM R= W RSD PL[SSi17! OSIL OP T KE"'MEMMA DC IDWRPMOIT C&TALLID M M IO W, W UD OR. &I WIG SYSTEMS & RACEWAYS SI W l @ UKAIID AS C{OS! AS ROMM T07M 13962. I®.OR YADBI & SRALL 9A"ONI TIC RIM. MPORYALL NFMRPTOAROMWWALLOCCOLOLIMBO2 gMUIDCATIDSOASTOLWMIFMCDMWRDURi PATKWARSMVW4AARaT&DCLYSL WrATWRMMWSOLOINGRiM@LMAUSOWIDWORNRACPWAIS& SILTR@ AINALOR6 TIC BOTTOM W LOAD SPROIGSTPOCNPALFRALWIG MEW111=143ACIL• WRIGSGI! (ODROO6If IOw SIDlSCI� vI5 m 1 SIROCTORALOrm-0 AS&VY1) 1 PRS.@ �s As � F­—Tr LIQUSL &SIIALLAOICQTO ALL M PAM ' 7•-6' AauaA,�anlRlse A,Rsas, rA-rxanazMsn . IWnammzaRLe PMY®n•"�"YSTROC ASdiA-ASIiAAA P+anR,flRwL,aaumATrnWv.. - orawaRlw rua Rarm aa;uAt :IL ARv.rA�mAn6uLa:DrATo nmaWc¢�erum.-nieola aclnwnPoaCaa3ra At01A1RTAiT@NYAl1a " CORAM COMMU SOL SDLI7A0v xoGmmcTsup w MA OMCIPASmIUMM imiLvrcRo7srlLi �`"�` °�TI�` &•u@SAIn f7@A �Ir-"..o. aOOR'.S: AMR.OTS `QTY17V 13mfm Items required: roof layout of all panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points. I LaoTtmfe@oeTaas RA5IOS�Z,SQirO.0 sCCPIrRAOOu"RAL¢) • SPSTSs:DOtf.1A5 RR .. RARSAMSRCOARP GRAMIUA W FORCETALS • SLW6Q' SRA Y -W I=ANOU•IWQ SRl:aaT44I.Mr- 000STTRBCOL11. sINUIL imiLvrcRo7srlLi �`"�` °�TI�` &•u@SAIn f7@A �Ir-"..o. aOOR'.S: AMR.OTS `QTY17V 13mfm Items required: roof layout of all panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points. I i Solar PV St ndard Plan — Simplified Central/String Inverter Sy�tems for One- and Two -Family Dwellings DIAGRAM #1- NO STRINGS COMBINED PRIOR TO CHECK A BOX FOR WHETHER SYSTEM IS GROUNDED OR UNGROUNDED. M1GROUNDEOJINOLUDE GEC) REFER TO STEP 16 FOR RAPID SHUTDOWN DETAILS Q UNGROUNDED 1 FOR UNGROUNDED SYSTEMS: - DC OCPD MUST DISCONNECT BOTH CONDUCTORS OF EACH SOURCE CIRCUIT - UNGROUNDED CONDUCTORS MUST BE IDENTIFIED PER 210.S(C). WHITE -FINISHED CONDUCTORS ARE NOT PERMITTED. • Consult with your local AW and /or Utility I O TAG I DESCRIPTION AND CONDUCTOR TYPE ICONDUCTORI NUMBER OF I CONDUIT/CABLE !1ICONDUITSUEI '1C MWNIIPfAO! TVDC ySSy� E� CONVERTERS ARE USED. CHECK THE BOX BELOW THE CORRESPONDING CONFIGURATION 11 13 ENTER'N/A' WHERE SUITABLE FOR PARALLEL DC/DC CONVERTERS ON ONE DC/DC CONVERTERS ARE ALL RUN MEN NOT USING CONDUIT OR CABLE SOURCE CIRCUIT (FIXED UNIT VOLTAGE IN SERIES (FIXED SOURCE ORXxIIT AS PERMITTED BY CODE I nCJnC CONVERTERS) VOLTAGE DC/DC CONVERTERS) • Consult with your local AHJ and /or Utility MODULES MODULES; • �-A2 �• COMBINERCONDUCTOR/ QTAG DESCRIPMONAND CONDUCTOR r .n.0 .ot c enc r Solar PV Standard Plan — Simplified Central/String Inverter Sys6nis for One- and Two -Family Dwellings SINGLE -LINE DIAGRAM #2 - COMBINING STRINGS PRIOR TO INVERTER CN--------- .. WHETHER SYSTEM 5 GROUNDED OR UNGROUNDED: Q GROUNDED (INCLUDE GEC) REFER TO STEP 16 FOR RAPID SHUTDOWN DETAILS QUNGROUNDED FOR UNGROUNDED SYSTEMS: - DC OCPD MUST DISCONNECT BOTH CONDUCTORS OF EACH SOURCE CIRCUIT - UNGROUNDED CONDUCTORS MUST BE IDENTIFIED PER 210.5(0). WHITE-FMEiHED CONDUCTORS ARE NOT PERMITTED. i 1 A ^ MAIN MMO PANEL M CBS ----- --------- 01 C • • .. • t1 • o • • • .............. .....� 62 IEDUIE NON -COMBINED STRINGSCONDU( F I CONDUIT/CABLE ; DESCRIPTION AND CONDO Its TYPE CONDUITSIZE �13TAG I I CONDUCTOR TYPE SIZ .j I ENTER 'N/A' WHERE SUITABLE FOR WHEN NOT USING CONDUIT OR CABLE AS PERMITTED BY CODE PVOCPO g1 DC/DCCOlMlITERSARE USED. THEY ARE RUN IN SERIES (FOND SOURCE • M