1716 E SYCAMORE STPermit Types
BLD ELE MEC PLM
X
Permit Number: BLD2022-04783
Issued: 10/07/2022
www.anaheim.neUbuilding
(714)765-4626
Quarter Section: 102
CITY OF ANAHEIM
Site
Site Addressk1,716 E SYCAMORE ST, ANAHEIM, CA 92805
Legal Description: N;TR-1451 BLK LOT 18
APN:03526804
BUILDING DMSION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Reroof: Remove existing material to install (20) squares of composition shingles over entire house and attached
garage
-Z-
Living Area: Number of Stories: 1 valuation: 91500.00
Garage Area: Construction Types: NIA
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinklered:
Cool Roof. Total Fees paid for Permit: 340.24
People Associated with Project:
Permit Applicant Theresa Delaney
Owner MAYER MARLENE R TR M R 1716 E SYCAMORE ST
Type Electrical Fixtures , Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and vold If the building or work has not passed final Inspection 365 days from the
data of permit Issuance. A new permit Is required to commence or continue work.
P�PNEIM CqC
City of Anaheim o� �O
Building Division F z
>
�DU�►DED %
Do not occupy this buildinq until the final inspections have been made.
FINAL INSPECTIONS DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
s' a
u' ng Final (7 4 765-5153) ae
Last Ins ' -Final Only After Abo a ompl ted
Z
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Jolst/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sionedn
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear Ver
(Sheathing/D)phragm/Frame), "
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed: ,
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will -be set within 2-3
business days after approval) Excludes New
Constructic
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service