2108 W SUNRISE AVE (8)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD202340636
Issued: 02/07/2023
www.anaheim.net/building
(714)765.4626
Quarter Section: 39
Site Address: 2108 W SUNRISE AVE, ANAHEIM, CA 92801
Legal Desciiption: N TR 2878 BLK LOT 21
APN: 07250109
Project Description: Plumbing to Replace sewer line
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765.5153
Living Area: Number of Stories: 0 Valuation: 0.00
Garage Area: Construction Types: NIA
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Spdnldered:
Cool Roof: Total Fees paid for Permit: 167.00
People,Assoclated with Project:
Permit Applicant Curtis Barnes
Owner BARNES CURTIS E & LIBERTY 1 2108 W SUNRISE AVE
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Sewer per 100 ft. 1
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
P�PNEIM cqC FINAL INSPECTIONS DATE INSPECTOR
City of Anaheim O�/�� All applicable items below must be signed before utilities are released
amuing urviSivn F i
Final Gas Test
u a
Electric Final XUAA
'Plumbing Final ---
DED
Mec ramMIT inaI
Cross Connection Control (714) 765-4280
Do not occupy this building until the final inspections have been made.
Engineering Final (714) 765-5126
INSPECTION I DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned:
Building Final (714 765-5153)
Plumbing (Ground/Underfloor Water)
Last Inspection -Final Only After Above Completed
Underfloor Rough Gas
Mechanical (Groundwork) PARTIAL INSPECTIONS
Electrical (Underground Conduit) Buildina Inspections
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been soonedo
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections
2nd Floor Shear
nf./Bond
Duct (Mach
Mechanical
Electrical
Rough COA/Mitagation Measures
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Plumbina Inspections �� I
-t�'r'
_I-1—''1 �z —X P. :I
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Testable Only)
Service